10.3 Connection to Host Controller
10-29
10
10.3.10 Example of Connection to MITSUBISHI’s AD75 Positioning Unit
(SERVOPACK in Position Control Mode)
* The ALM signal is output for about two seconds when the control power is turned ON. Take this into
consideration when designing the power ON sequence. The ALM signal actuates the alarm detection
relay 1Ry to stop the main circuit power supply to the SERVOPACK.
Note: Only signals applicable to Mitsubishi’s AD75 Positioning Unit and Yaskawa’s SGDJ-
P
SERVOPACK are shown in the diagram.
+
-
+24V
024V
1Ry
CN1
CN1
STOP
DOG
READY
PGO
PULSE
SIGN
CLEAR
1Ry
2.2K
24
6
5
4
2
1
35
34
25
16
17
14
13
/S-ON
P-OT
N-OT
25
24
14
7
26
23
5
22
4
21
3
+24 V
0
24
V
+24V
PULS
CLR
SIGN
/PULS
/CLR
/SIGN
ALM+
ALM -
PCO
/PCO
Positioning unit AD75
manufactured by
Mitsubishi
I/O power supply
X-axis (Y-axis)
SGDJ-
P SERVOPACK
ON when
proximity is
detected.
ON when
positioning is
canceled.
11
3
CN2
C1
L2
L1
C2
W
V
1
2
3
4
U
Servomotor
M
PG
Control power supply
Main circuit power supply
Содержание SGDJ Series
Страница 19: ...xix INDEX Revision History ...
Страница 34: ...2 Selections 2 8 2 4 Selecting Cables CN4 c d e FG ...
Страница 176: ...8 3 8 ...