Checklist modification and retrofitting
E Checklist modification and retrofitting
Checklist
Run.
No.
Requirement
fulfilled
Notes
5
Modification and retrofitting
yes
no
5.1
Is the modification/retrofitting compatible? Are the
requirements of the checklists of planning, installation,
commissioning and validation further fulfilled?
‘Checklist planning’...page 215
‘Checklist installation’...page 216
‘Checklist commissioning, parametrization and vali-
5.2
Was the safety component to be replaced exchanged
for a compatible safety component?
5.3
If non-safety components are changed, is the
checksum unchanged?
5.4
Was the correct security project loaded?
5.5
Are the calculated reaction times further kept after mod-
ification/retrofitting? Proof necessary!
5.6
Were the project data copied on a memory card?
5.7
Was a complete functional test accomplished and docu-
mented?
Date:.........................Name: ...................................Sign: ......................................................