
218
HB700 | CPU | PMC921xEx | en | 24-04
Checklist operation
iC9200 Series
D Checklist operation
Checklist
Run.
No.
Requirement
fulfilled
Notes
4
Operation
yes
no
4.1
Is it guaranteed that no changes are made to the system
configuration during operation of the safety CPU?
4.2
Is it guaranteed that before expanding the system,
removing individual system components and making
changes to the wiring, the control system is set to a
safe state dependent on the application by competent
personnel?
4.3
Are the ambient conditions specified in the technical data
observed?
4.4
Is the lifetime of all safety-related components specified
by the manufacturer observed?
4.5
Is it guaranteed that commissioning only takes place
after acclimatisation of the safety CPU and the safety
modules?
4.6
Is it guaranteed that a PC system with executable iCube
Engineer is available during the entire operating time?
Date: ......................... Name: ..................... .............. Signature: .................................. ....................
Содержание iC9200 Series
Страница 211: ...7 Appendix...
Страница 212: ......
Страница 214: ...214 HB700 CPU PMC921xEx en 24 04 Checklists Deployment CPU iC921xM FSoE iC9200 Series...