63
x4
19/32 x 3 x 23" (1,5 x 7,6 x 58,4 cm)
GI
19/32 x 3 x 64-7/16" (1,5 x 7,6 x 163,7 cm)
x1
DNA
19/32 x 3 x 44-1/8" (1,5 x 7,6 x 112,1 cm)
x2
DKA
Fig. C
(11) Special Coating Screws
3/4" (1,9 cm)
Screws from behind.
DOOR TRIM
PARTS REQUIRED:
3/4" (1,9 cm)
x56
CENTER
9"
(22,9 cm)
2" (5,1) Nails x5
Two Screws
Door
Trim
Fig. A
Door
Panel
GI
DNA
Nail into
framing.
CENTER
CENTER
Fig. B
GI
9"
(22,9 cm)
Center metal threshold between doors and secure using eleven 3/4" special
coating screws into floor as shown
(Fig, C
).
5
6
You have finished securing your door and trim.
FINISH
7
BEGIN
1
2
Secure top two horizontal door rails
GI
9" down with four 3/4" screws from behind as shown.
Secure two vertical door rails
DKA
with four 3/4" screws from behind to center of door as shown.
2
Secure other two
GI
below
DKA
with four 3/4" screws from behind as shown.
Secure door trim from inside using 3/4" screws as shown
(Fig. A)
.
Center trim
DNA
over doors and secure using five 2" finish nails into framing as shown.
3
4
Reinforce the door trim using 3/4" screws through door panel into trim
(Fig. A)
.
Locate screws as shown in
Fig. B
. Use two screws at seams.
x1
64" Metal Threshold
3/4" (1,9 cm) x11
Bagged seperately / special coating
x5
2" (5,1 cm)
GI
DKA
DKA
DKA
Содержание OAKRIDGE 8 x 12
Страница 2: ...This page intentionally left blank...
Страница 85: ...This page intentionally left blank...
Страница 86: ...This page intentionally left blank...
Страница 87: ...This page intentionally left blank...