Center front wall on floor side-to-side.
Secure top plate to side walls using two 3" nails
(Fig. A, B, E )
.
Secure lower edge of panel to floor frame using eight 2" nails 6" apart Angle nail to hit floor frame
(Fig. C)
.
Secure bottom plates with three 3" nails on each side
(Fig. C)
.
Secure top plate to side walls using two 3" screws
(Fig. A, B)
.
Remove temporary brace OO.
Nail front wall panels to side wall using 1-1/2" nails 6" apart
(Fig. D)
.
1
2
3
4
5
6
30
3" (7,6 cm)
FRONT WALL INSTALLATION
2" (5,1 cm)
x8
x2
x26
1-1/2" (3,8 cm)
PARTS REQUIRED:
Center wall assembly on floor.
3" (7,6 cm)
x8
BEGIN
Stand front wall on floor.
It is important to secure the frontwall in the following order.
(2) 3" (7,6 cm)
Screws
(2) 3" (7,6 cm)
Nails
3" (7,6 cm)
Nail
1-1/2" (3,8 cm)
Nails
3" (7,6 cm) Nails
3" (7,6 cm) Nails
Nail 2" nails first.
Angle nail to hit
floor frame.
Maintain 56" dimension
Fig. A
Flush
Flush
Fig. B
Fig. C
Fig. E
Fig. D
2" (5,1 cm) Nails
You have finished standing your front wall.
FINISH
7
Содержание OAKRIDGE 8 x 12
Страница 2: ...This page intentionally left blank...
Страница 85: ...This page intentionally left blank...
Страница 86: ...This page intentionally left blank...
Страница 87: ...This page intentionally left blank...