Step 9.
Attach the corner bracket (3F) to the swing beam and end post.
Fasten it with 1 3/4” washer head screws.
Step 10.
Lift the swing beam up into place on the tower.
Step 11.
Fasten the swing beam bracket to the 2x6 using 3” lags after
placing it in position.
Step 12.
Next pre-drill two 7/16” holes through the 2x6 then fasten the
bracket with two 2 3/4” threaded rods.