background image

Step 4. 

Pre-drill four 1/2” holes then attach the bracket using the included 

lags.

Step 1. 

Start the swing frame assembly with the 2x6 swing beam. (3A)

Step 2. 

Fasten the swing bearings (3H) to the swing beam using the lags 

provided with the bearings.

These holes should all be pre-drilled.

Step 3. 

Place the glider bracket (4M) in position.

Содержание Titan Playset

Страница 1: ...866 210 9273 YARDCRAFT COM 271 S Shirk Road New Holland PA 17557 Titan Playset ASSEMBLY MANUAL...

Страница 2: ...t s Titan Vinyl Playset With two slides a rock climbing wall monkey bars and swings for up to seven kids you ll be the hit of the entire neighborhood There s an even a hammock swing for you to relax w...

Страница 3: ...G 14ft Avalanche Slide 1 2I 2x4 Roof Brackets 3 4H Tic Tac Toe Panel 1 2J 2x4 Support Brackets 2 4I Telescope 1 4J Binoculars 1 4K Tire Swing 1 3A 14 2x6 Swing Beam 1 4L Hammock Swing 1 3B 117 4x4 End...

Страница 4: ...ods notice how the holes are offset and need to align with the holes in the 2x6 s Step 4 Fasten the 4x4 posts in place with washers and acorn nuts over the threaded rods 6E 6D Only hand tighten these...

Страница 5: ...ts through the joist hangers using 1 3 4 washer head screws 6F Step 8 Before you install the floor measure across the corners to square the frame Step 5 Fasten the posts to the side 2x6 s using 6 7 8...

Страница 6: ...brackets 6A and 6 7 8 threaded rods with washers and acorn nuts Two of the 2x6 s have vinyl caps on one end these caps get placed on the side with the 74 4x4 s Step 12 Fasten the top and bottom of ea...

Страница 7: ...side 2x6 s upright and set the bottom 2x6 on top Keep the bottom 2x6 even with the long point on the side 2x6 s Fasten them together with four 3 1 2 lags 6H in the predrilled holes Step 13 The next st...

Страница 8: ...Fasten the legs using four 4 threaded rods Insert the threaded rods through the predrilled holes then thread them into the t nuts Fasten the outside using washers and acorn nuts Step 20 Use a 4 lag in...

Страница 9: ...net rock wall and ladder panels and prepare to install them 4D 4E 4A These are all interchangeable with each other and can be arranged however you like There will be a empty spot next to one of the p...

Страница 10: ...nto the tower legs Step 26 Also fasten the two panels together using the same lags through the two center 2x6 s Step 27 Fasten the top of the panels to the tower using 3 1 2 lags through the 56 2x6 St...

Страница 11: ...slide will go later Attach it to the tower leg using three 3 1 2 lags Step 31 The ladder comes with a poly trim piece for the side Center it on the 2x6 and fasten it with 1 1 2 vinyl screws Step 32 Th...

Страница 12: ...ods to fasten them only finger tighten these at this point Step 35 Place two 128 4x4 posts 1K at the other end of the 2x6 s Use 6 7 8 threaded rods to hold them in place for the moment Step 36 Using t...

Страница 13: ...it then tighten the rest of the threaded rods on the playset Step 37 Install the 2x6 corner brackets and fasten the rods using acorn nuts and washers Fasten the top and bottom of the brackets using 1...

Страница 14: ...sts for the railing Two of these have a vinyl end cap Install them with the end caps facing the 5ft platform Fasten the 2x6 s with 2x6 corner brackets and 6 7 8 threaded rods Step 43 Install one 56 2x...

Страница 15: ...de to be on Fasten with the 1 3 4 washer head screws Step 46 Fill the other sides in with slats using the spacer to position them Step 47 The playset should look similar to the picture at this point B...

Страница 16: ...he included lags Step 1 Start the swing frame assembly with the 2x6 swing beam 3A Step 2 Fasten the swing bearings 3H to the swing beam using the lags provided with the bearings These holes should all...

Страница 17: ...threaded rods Only finger tighten the nuts at this point Step 6 Attach the swing beam bracket 3G to the end of the beam without the end caps Use two 4 7 8 threaded rods with washers and acorn nuts to...

Страница 18: ...h 1 3 4 washer head screws Step 10 Lift the swing beam up into place on the tower Step 11 Fasten the swing beam bracket to the 2x6 using 3 lags after placing it in position Step 12 Next pre drill two...

Страница 19: ...ep 14 Place the 2x4 end braces 3D in place and fasten the bottom ends to the ground 2x4 Use two 4 1 8 threaded rods to fasten them Step 15 Fasten the top ends of the braces to the end post using 4 lag...

Страница 20: ...he swings to finish the swing frame assembly Step 1 Locate these parts to begin the climbing set assembly Step 2 Install the ladder end brackets 5E on the end of the top ladder 5A Fasten them with 2 5...

Страница 21: ...1 8 threaded rods Step 4 Flip the climbing set over and place it in position on the 5ft platform Step 5 Fasten the side tabs on the end brackets using 3 lags Step 6 Next pre drill two 7 16 holes throu...

Страница 22: ...threaded rods Step 8 Locate the 2x4 side braces 5D and install them as shown Fasten the bottom ends to the ground runner 2x4 using 4 1 8 threaded rods Step 9 Fasten the top of the braces using 4 lags...

Страница 23: ...4 2x4 s 2A on the outside of the 4x4 posts Keep them centered and up against the vinyl post caps then fasten them with 3 lags Step 3 Locate the three 51 2x4 s 2C and fasten the 2x4 roof brackets 2I to...

Страница 24: ...roof 2G and prepare to install it To fasten it first place one of the 61 2x4 s on the end of the 104 2x4 s and fasten it with two 3 lags Then take the other 2x4 up over the top and out to the other en...

Страница 25: ...104 2x4 on the outside of the 54 4x4 posts and fasten it with 3 lags Keep the 2x4 centered and up against the vinyl post caps Step 8 Place the 2x4 support bracket 2J on the 74 4x4 post on the lower pl...

Страница 26: ...2x4 then pre drill a 1 4 hole through the 51 2x4 and fasten it with a 3 lag Step 15 Locate the lower tarp roof and install it the same as the upper roof as shown in step 7 This roof will have 55 1 4 2...

Страница 27: ...inyl screws You can also fasten it up through the floorboards using the same screws for added stability 10ft Avalanche Slide 14ft Avalanche Slide 4F 4G Place the two slides in the empty spots on the p...

Страница 28: ...ce the hammock swing mounting bracket on the center 2x4 floor joist on the 7ft platform Fasten it with 3 lags Tire Swing 4K Fasten the tire swing to the bracket using the included chains 10ft Avalanch...

Страница 29: ...l at your desired location and fasten the top end using the same screws as the last step Tic Tac Toe Panel 4H Fasten the 2x6 to the poly slats using 1 3 4 washer head screws Tic Tac Toe Panel 4H The t...

Страница 30: ...a mounting base a bolt and a lag Binoculars 4J Attach the binoculars to the base using the bolt Telescope 4I The telescope comes with a mounting base a bolt and a lag Binoculars 4J Use the lag to moun...

Страница 31: ...Telescope 4I Use the lag to mount the telescope base to the 2x6 railing Telescope 4I Attach the telescope to the base using the bolt...

Отзывы: