Step 4.
Pre-drill four 1/2” holes then attach the bracket using the included
lags.
Step 1.
Start the swing frame assembly with the 2x6 swing beam. (3A)
Step 2.
Fasten the swing bearings (3H) to the swing beam using the lags
provided with the bearings.
These holes should all be pre-drilled.
Step 3.
Place the glider bracket (4M) in position.