CRANKSHAFT AND PISTON
5-32
4. Measure:
• Crankshaft pin to connecting rod clearance
Out of specification
→
Replace the crank-
shaft or connecting rod.
a. Clean the crankshaft pin, and inside of the
connecting rod halves.
b. Put a piece of Plastigauge® “1” on the
crankshaft pin.
c. Lubricate the connecting rod cap bolts
threads with engine oil.
d. Assemble the connecting rod “1” and con-
necting rod cap “2”.
NOTICE
Do not allow the connecting rod and crank-
shaft to rotate until the clearance measure-
ment has been completed.
e. Tighten the connecting rod cap bolts to the
specified torque in two stages.
f. Remove the connecting rod and connect-
ing rod cap.
g. Measure the compressed Plastigauge®
width “a”.
CHECKING THE BALANCER
1. Check:
• Balancer
Scratches/wear/damage
→
Replace the bal-
ancer.
INSTALLING THE CONNECTING ROD AND
PISTON
1. Install:
• Oil seal “1”
(into the crankcase “2”)
Crankshaft pin outside diameter
35.969–35.984 mm
(1.4161–1.4167 in)
Crankshaft pin to connecting rod
clearance
0.016–0.046 mm
(0.0006–0.0018 in)
a
1
T
R
.
.
Connecting rod cap bolt
20 N·m (2.0 kgf·m, 15 lb·ft)
Installed depth
0.5–1.5 mm (0.02–0.06 in)
1
2
a
New
Содержание UMAX
Страница 1: ...SERVICE MANUAL UTILITY VEHICLE J0F F8197 E1 YUM1A YUM2A YUM2E LIT 19616 A0 37...
Страница 2: ......
Страница 6: ......
Страница 8: ......
Страница 25: ...GENERAL SPECIFICATIONS 2 2 1174 kg 2589 lb YUM2E Hill claiming ability 20 YUM1A 15 YUM2A YUM2E...
Страница 33: ...ELECTRICAL SPECIFICATIONS YUM1A YUM2A 2 10 USB fuse 5 A...
Страница 43: ...TIGHTENING TORQUES 2 20...
Страница 46: ...CABLE ROUTING 2 23 YUM1A Front and rear A B C 1 1 1 1 2 3 4 3 4 1 2 3 4 5 6...
Страница 48: ...CABLE ROUTING 2 25 YUM1A Left side A B D C 1 2 3 4 4 4 4 5 6 7 8 9...
Страница 50: ...CABLE ROUTING 2 27 YUM1A Brake and throttle cables A B 1 3 2 3 1 2 2 4 5...
Страница 52: ...CABLE ROUTING 2 29 YUM1A Shift cables 1 2 3 1 2 4 1 2...
Страница 53: ...CABLE ROUTING 2 30 1 Shift control cable forward 2 Shift control cable reverse 3 Plastic band 4 Reverse switch...
Страница 54: ...CABLE ROUTING 2 31 YUM2A Frame top view A B C 1 1 1 2 3 4 5 6 7 8 1 1 1 1 1 2 3 6 9 10 11 12 13 14 15 16 D E...
Страница 56: ...CABLE ROUTING 2 33 YUM2A Front and rear A B C D 1 1 1 1 1 2 2 3 3 4 4 3 4 5 6 7...
Страница 58: ...CABLE ROUTING 2 35 YUM2A Left side A B C D 1 2 3 4 4 4 4 6 7 8 9 10 5...
Страница 60: ...CABLE ROUTING 2 37 YUM2A Brake throttle and shift cables A A B C D 1 1 2 3 3 4 5 4 5 6 6 7 8 9...
Страница 62: ...CABLE ROUTING 2 39 YUM2E Frame top view A A B 1 2 3 4 5 6 7 C D E E 6 6 6 8 9 10 11 12...
Страница 64: ...CABLE ROUTING 2 41 YUM2E Front and rear 1 1 2 3 4 3 A...
Страница 66: ...CABLE ROUTING 2 43 YUM2E Left side B 2 1 3 4 5 6 7 8 9 10 11 A 9...
Страница 68: ...CABLE ROUTING 2 45 YUM2E Brake cable A A B C 1 2 4 3...
Страница 70: ...CABLE ROUTING 2 47...
Страница 73: ......
Страница 96: ...4 YEAR CHECKS 3 23...
Страница 99: ......
Страница 134: ...FRONT SUSPENSION COMPONENTS 4 35 4 3 1 2 5 a...
Страница 138: ...REAR SUSPENSION COMPONENTS 4 39...
Страница 174: ...CRANKSHAFT AND PISTON 5 35...
Страница 196: ...TRANSMISSION YUM1A YUM2A 7 13 Refer to CHECKING THE SHIFT LEVER YUM1A YUM2A on page 3 8...
Страница 202: ...TRACTION MOTOR YUM2E 7 19...
Страница 205: ......
Страница 217: ...CHARGING SYSTEM YUM1A YUM2A 8 12...
Страница 218: ...CHARGING SYSTEM YUM2E 8 13 CHARGING SYSTEM YUM2E CIRCUIT DIAGRAM R R B R B B B B 27 28 27 Battery 28 Charging receptacle...
Страница 223: ...LIGHTING SYSTEM YUM1A YUM2A 8 18...
Страница 227: ...LIGHTING SYSTEM YUM2E 8 22...
Страница 233: ...SIGNALING SYSTEM YUM1A YUM2A 8 28...
Страница 243: ...FUEL INJECTION SYSTEM YUM1A YUM2A 8 38...
Страница 247: ...FUEL PUMP SYSTEM YUM1A YUM2A 8 42...
Страница 284: ...ELECTRICAL COMPONENTS YUM2E 8 79...
Страница 313: ...PC GENIUS GOLF CAR PROGRAMMING SYSTEM YUM2E 9 28...
Страница 315: ......
Страница 316: ......