4-73
ENG
CRANKCASE, CRANKSHAFT AND BALANCER
4. Check:
• Crankshaft and transmission operation
Unsmooth operation
→
Repair.
3. Tighten:
• Lead guide
1
• Clutch cable holder
2
• Bolt (crankcase) [45 mm (1.8 in)]
3
• Bolt (crankcase) [55 mm (2.2 in)]
4
• Bolt (crankcase) [30 mm (1.2 in)]
5
10 Nm (1.0 m · kg, 7.2 ft · lb)
10 Nm (1.0 m · kg, 7.2 ft · lb)
10 Nm (1.0 m · kg, 7.2 ft · lb)
• Apply Quick gasket
®
(YAMAHA Bond
No.1215) on end of the crankcase bolts [45
mm (1.8 in)]
3
, as shown.
• Tighten the crankcase bolts in stage, using a
crisscross pattern.
Quick gasket
®
:
ACC-QUICK-GS-KT
YAMAHA Bond No.1215:
90890-85505
5. Install:
• Timing chain
1
• Intake timing chain guide
2
• Bolt (intake timing chain guide)
10 Nm (1.0 m · kg, 7.2 ft · lb)
LT
TIP
Содержание TT-R125EY
Страница 1: ...TT R125EY TT R125LEY 1B2 F8197 14 SERVICE MANUAL LIT 11626 22 26 ...
Страница 10: ...MEMO ...
Страница 116: ...4 23 ENG 5 Install Camshaft bearing holder 1 Bolt 2 CAMSHAFT AND ROCKER ARMS 10 Nm 1 0 m kg 7 2 ft lb LT ...
Страница 257: ......
Страница 258: ...YAMAHA MOTOR DA AMAZÔNIA LTDA ...