2-28
SPEC
CABLE ROUTING DIAGRAM
U
After connecting the main switch
coupler, engine stop switch
coupler, clutch switch coupler
and start switch coupler, put a
connector cover on the couplers
and push them in at the rubber
cover end.
V
Pass the wire harness on the
oustide of the main switch
coupler.
W
Do not allow the primary coil
lead to slacken where it is bare
of the protecting tube.
X
Fasten the CDI unit lead and
starting circuit cut-off relay lead
with a plastic locking tie at the
tape holding the main switch
lead, engine stop switch lead,
clutch switch lead, and start
switch lead together.
Y
Position the CDI magneto lead,
wire harness and rear shock
absorber assembly sub-tank
hose (TT-R125LE only) as
shown.
Z
Fasten the wire harness, CDI
magneto lead and rear shock
absorber assembly sub-tank
hose (TT-R125LE only) at the
protecting tube for the CDI
magneto lead.
A A Fasten the rectifier/
regulator lead as shown.
A B Do not allow the CDI
magneto lead to slacken.
Содержание TT-R125EY
Страница 1: ...TT R125EY TT R125LEY 1B2 F8197 14 SERVICE MANUAL LIT 11626 22 26 ...
Страница 10: ...MEMO ...
Страница 116: ...4 23 ENG 5 Install Camshaft bearing holder 1 Bolt 2 CAMSHAFT AND ROCKER ARMS 10 Nm 1 0 m kg 7 2 ft lb LT ...
Страница 257: ......
Страница 258: ...YAMAHA MOTOR DA AMAZÔNIA LTDA ...