6-17
ELEC
–
+
W
B
R
Y
2
1
W Sb
Y B
1
2
CHARGING SYSTEM
EC624000
COUPLERS AND LEADS
CONNECTION
INSPECTION
1. Check:
• Couplers and leads connection
Rust/dust/looseness/short-circuit
→
Repair or replace.
CHARGING VOLTAGE INSPECTION
1. Start the engine.
2. Inspect:
• Charging voltage
Out of specification
→
If no failure is found
in checking the source coil resistance,
replace the rectifier/regulator.
Tester selector
position
Charging
voltage
DCV-20
14.0 ~ 15.0 V at
5,000 r/min
Tester (+) lead
→
Red lead
1
Tester (–) lead
→
Black lead
2
3. Inspect:
• Charging coil resistance
Out of specification
→
Replace.
Tester selector
position
Charging coil
resistance
Ω
x 1
0.64 ~ 0.96
Ω
at
20 °C (68 °F)
Tester (+) lead
→
White lead
1
Tester (–) lead
→
Black lead
2
Содержание TT-R125EY
Страница 1: ...TT R125EY TT R125LEY 1B2 F8197 14 SERVICE MANUAL LIT 11626 22 26 ...
Страница 10: ...MEMO ...
Страница 116: ...4 23 ENG 5 Install Camshaft bearing holder 1 Bolt 2 CAMSHAFT AND ROCKER ARMS 10 Nm 1 0 m kg 7 2 ft lb LT ...
Страница 257: ......
Страница 258: ...YAMAHA MOTOR DA AMAZÔNIA LTDA ...