4 - 47
ENG
CLUTCH AND PRIMARY DRIVEN GEAR
5. Install:
●
Ball
NOTE:
Apply the engine oil on the ball.
6. Install:
●
Push rod 1
1
●
Push plate
2
●
Washer
3
●
Nut (push rod 1)
4
7. Install:
●
Pressure plate
1
●
Clutch spring
2
●
Bolt (clutch spring)
3
NOTE:
●
Align the arrow mark
a
on the pressure
plate with the punched mark
b
on the clutch
boss.
●
Tighten the bolts in stage, using a crisscross
pattern.
T
R
.
.
6 Nm (0.6 m · kg, 4.3 ft · lb)
8. Check:
●
Push lever position
Push the push lever assembly in the
arrow direction and make sure that the
mach mark are aligned
→
adjust.
a
Match mark on the push lever assembly
b
Match mark on the crankcase
Содержание TT-R125(N)
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENT ENGINE CHASSIS ELECTRICAL...
Страница 47: ...GEN INFO MEMO...
Страница 157: ...INSP ADJ MEMO...
Страница 254: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT...
Страница 501: ...ELEC MEMO...
Страница 508: ...PRINTED IN JAPAN 2000 6 0 8 1 CR PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...