Periodic maintenance and adjustment
7-15
1
2
3
4
5
6
7
8
9
10
11
12
er A by removing the bolts and
quick fastener.
TIP
The quick fastener is removed by push-
ing in the center pin and then pulling the
fastener out.
6. Remove the coolant reservoir cov-
er B and coolant reservoir by re-
moving the bolts.
7. Remove the collars and coolant
reservoir cap, and then turn the
coolant reservoir upside down to
empty it.
8. After the coolant is completely
drained, thoroughly flush the cool-
ing system with clean tap water.
9. Install the collars, coolant reservoir
and its covers by placing them in
the original position, and then in-
stalling the bolts and quickfastner.
TIP
The quick fastener is installed by push-
ing out the center pin, inserting the fas-
tener into the cover, and then by
pushing the center pin flush with the
1. Quick fastener
2. Coolant reservoir cover A
3. Bolt
1
3
2
1. Bolt
2. Coolant reservoir cover B
3. Coolant reservoir
4. Coolant reservoir cap
5. Collar
1
2
5
3
4
1. Coolant reservoir cap
2. Coolant reservoir
1
2
BW8-9-E0_1.book 15 ページ 2016年12月13日 火曜日 午前10時39分
Содержание MT-10 SP 2016
Страница 116: ...BW8 9 E0_1 book 3...
Страница 117: ...BW8 9 E0_1_Euro_E_Hyoshi indd 3 2016 12 13 11 10 32...