ABS (ANTI-LOCK BRAKE SYSTEM)
4-65
Removing the metering valve, proportioning valve, and brake pipes
Order
Job/Parts to remove
Q’ty
Remarks
Right side cover
Refer to “GENERAL CHASSIS” on page
4-1.
Brake fluid
Drain.
Refer to “BLEEDING THE HYDRAULIC
BRAKE SYSTEM (ABS)” on page 3-14.
1
Brake pipe union bolt/Gasket
2/4
2
Brake pipe (metering valve to right front brake
caliper)
1
Disconnect.
3
Brake pipe (hydraulic unit to metering valve)
1
4
Metering valve
1
5
Brake hose holder
1
6
Brake pipe (proportioning valve to rear brake
hose)
1
7
Brake pipe (hydraulic unit to proportioning
valve)
1
8
Proportioning valve
1
9
Brake pipe union bolt/Gasket
2/4
10
Brake hose union bolt/Gasket
1/2
11
Brake pipe (brake pipe/upper joint assembly to
front brake calipers)
1
Disconnect.
9
9
11
15
16
14
17
9
9
10
13
1
1
1
1
3
2
5
8
6
7
4
12
T
R
.
.
7 Nm (0.7 m
•
kg, 5.1 ft
•
Ib)
T
R
.
.
7 Nm (0.7 m
•
kg, 5.1 ft
•
Ib)
T
R
.
.
7 Nm (0.7 m
•
kg, 5.1 ft
•
Ib)
T
R
.
.
30 Nm (3.0 m
•
kg, 22 ft
•
Ib)
T
R
.
.
16 Nm (1.6 m
•
kg, 11 ft
•
Ib)
T
R
.
.
16 Nm (1.6 m
•
kg, 11 ft
•
Ib)
T
R
.
.
7 Nm (0.7 m
•
kg, 5.1 ft
•
Ib)
T
R
.
.
16 Nm (1.6 m
•
kg, 11 ft
•
Ib)
T
R
.
.
7 Nm (0.7 m
•
kg, 5.1 ft
•
Ib)
T
R
.
.
30 Nm (3.0 m
•
kg, 22 ft
•
Ib)
T
R
.
T
R
.
.
16 Nm (1.6 m
•
kg, 11 ft
•
Ib)
T
R
.
.
7 Nm (0.7 m
•
kg, 5.1 ft
•
Ib)
30 Nm (3.0 m
•
kg, 22 ft
•
Ib)
New
New
New
New
New
New
New
New
Содержание FJR1300A(D)
Страница 1: ...2013 SERVICE MANUAL FJR1300A D 1MC 28197 E0 ...
Страница 6: ......
Страница 8: ......
Страница 70: ...SPECIAL TOOLS 1 61 ...
Страница 101: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 30 ...
Страница 104: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 EAS20410 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4 ...
Страница 106: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 1 3 2 ...
Страница 107: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 36 1 Main axle 2 Drive axle 3 Oil delivery pipe 1 ...
Страница 108: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 6 5 4 3 2 1 ...
Страница 110: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 1 2 3 4 5 6 7 8 9 ...
Страница 112: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 41 4 5 3 2 1 9 8 6 7 ...
Страница 114: ...COOLING SYSTEM DIAGRAMS 2 43 EAS20420 COOLING SYSTEM DIAGRAMS 3 13 4 5 6 7 7 7 8 1 2 10 9 14 15 16 17 11 12 3 ...
Страница 116: ...COOLING SYSTEM DIAGRAMS 2 45 7 1 2 3 4 5 5 8 9 6 8 9 10 11 12 ...
Страница 122: ...CABLE ROUTING 2 51 Rear brake hose right side view 4 5 6 7 8 9 10 11 1 12 13 14 15 2 3 16 1 A B C F E D ...
Страница 124: ...CABLE ROUTING 2 53 Horn and radiator left side view A B 1 1 2 3 4 5 5 6 C 7 7 8 ...
Страница 128: ...CABLE ROUTING 2 57 Rear fender left side view 2 1 3 4 6 5 7 A C B 8 4 5 4 5 J I K 9 10 1 11 12 13 14 15 D F G H E 16 ...
Страница 132: ...CABLE ROUTING 2 61 Rear fender top view 1 2 3 B C A B ...
Страница 138: ...CABLE ROUTING 2 67 ...
Страница 141: ......
Страница 320: ...CAMSHAFTS 5 19 11 Install Cylinder head cover plate 1 TIP Be sure the UP mark a is facing up New 2 2 a 1 3 a a 1 ...
Страница 360: ...SHIFT SHAFT 5 59 c Tighten both locknuts to specification T R Shift rod locknut 7 Nm 0 7 m kg 5 1 ft lb 1 2 c d a b ...
Страница 377: ...MIDDLE GEAR 5 76 Middle driven pinion gear shim Thickness mm 0 10 0 15 0 20 0 30 0 40 0 50 ...
Страница 428: ...WATER PUMP 6 15 ...
Страница 442: ...AIR INDUCTION SYSTEM 7 13 EAS27040 AIR INDUCTION SYSTEM 1 2 3 5 6 7 8 1 1 2 1 1 3 6 7 8 2 2 3 5 4 ...
Страница 455: ...IGNITION SYSTEM 8 6 ...
Страница 461: ...ELECTRIC STARTING SYSTEM 8 12 ...
Страница 465: ...CHARGING SYSTEM 8 16 ...
Страница 477: ...SIGNALING SYSTEM 8 28 ...
Страница 533: ...FUEL INJECTION SYSTEM 8 84 ...
Страница 551: ...CRUISE CONTROL SYSTEM 8 102 ...
Страница 555: ...FUEL PUMP SYSTEM 8 106 ...
Страница 563: ...ACCESSORY BOX SYSTEM 8 114 ...
Страница 573: ...IMMOBILIZER SYSTEM 8 124 ...
Страница 577: ...ABS ANTI LOCK BRAKE SYSTEM 8 128 ...
Страница 616: ...ELECTRICAL COMPONENTS 8 167 7 1 3 2 18 21 20 19 9 11 12 13 14 15 16 17 6 8 4 5 10 ...
Страница 658: ......
Страница 659: ......
Страница 660: ......