4
Installation
74
07.2020
ba
-o
.2
.6
.0
-us
-3
.2
-ys
|
A1
18
67
50
1 Re
v A
E
Load the wire rope hoist multiple times (max. load). The following is recommended:
–
Load and hold 5 times; each holding phase should last at least one minute.
–
The result of the load is a rope that is firmly drawn into the rope bag.
Check the protruding end of the rope wedge.
–
Maximum value per “x” (see table).
Check
dimension “a” and “b” during annual maintenance.
–
To ensure the rope does not slip out of the rope bag.
–
With deviations, assemble the rope again as described.
Rope Ø
Part number
L
a
b
x
Tightening torque
[in]
[in]
[lb
f
ft]
0.354
A70009035
5.9
0.98 0.98 0.24
15
0.492
A70009036
5.9
0.98 0.98 0.39
30