7. Startup
Initial Checks
Before switching on power the following steps must be checked.
1. The local mains power supply voltage corresponds to the voltage
printed on the identification label of the transmitter.
2. All electrical connections are made in accordance with the electrical
connection diagram shown on page
.
3. All terminal screws are tightened.
4. All cable glands are tightly secured.
5. All grounding connections are made in accordance with the instruc-
tions in this manual (see page
).
Initial Measurement
1. Make sure that the sensor is completely covered by liquid.
2. Turn on power to the transmitter and wait one minute before taking
the initial measurement.
Language Selection
1. The default display language is English. If another language is re-
quired, proceed with step 2.
2. Select "Display Setup" from the Main Menu.
3. Select "Language" from the Display Setup menu and chose the re-