Xylem Lowara LS Series Скачать руководство пользователя страница 23

Installation, Operating and Maintenance Instruction

Model LS, LC, LCP

 

D

is

c

har

ge t

oo l

ow

 

D

is

c

har

ge s

tops

 af

ter

 a t

im

e

 

H

ead t

oo l

ow

 

H

ead t

oo hi

gh

 

D

ri

v

e m

ec

hani

s

m

 ov

er

loaded

 

 P

um

p not

 r

unni

ng qui

et

ly

 

T

em

per

at

ur

e i

n pum

p t

oo hi

gh

 

T

em

per

at

ur

e i

n s

haf

t s

eal

ing t

oo hi

gh

 

T

em

per

at

ur

e at

 t

he bear

ing t

oo hi

gh

 

P

um

p l

eak

ing

 

Leak

age r

at

e at

 s

haf

t s

eal

ing t

oo hi

gh

 

Cause 

Solution 

 

Back-pressure too high 

check facility for pollution, open discharge valve 
reduce resistance in discharge pipe (e.g. clean filter if 
necessary) 
use larger impeller (note available motor power) 

 

 

 

Back-pressure too low, discharge too low 

throttle discharge valve 

 

 

Speed too high 

reduce speed 
compare speed of motor with specified pump speed (rating 
plate) 
when adjusting speed (frequency transformer) check reference 
value setting 

 

 

Speed too low 

increase speed (check available motor power) 
compare speed of motor with specified pump speed (rating 
plate) 
when adjusting speed (frequency transformer) check reference 
value settings 

 

 

 

 

Flow too little 

increase min. flow (open discharge valve, bypass) 

 

Flow too big 

reduce flow (throttle discharge valve) 

 

 

Impeller diameter too big 

use smaller impeller 

 

 

Impeller diameter too small 

use larger impeller (check available motor power) 

 

 

 

 

Pump and/or pipes not completely filled with liquid 

fill 
vent 

 

 

 

Pump or suction/intake pipe blocked 

clean 

 

 

Air pocket in pipeline 

vent 
improve course of pipe 

 

 

 

 

 

Suction height too big / NPSH of system too small 

increase liquid level and admission pressure 
reduce resistance in the intake/suction pipe (change course 
and rated width, open shut-off valves, clean filters) 

 

 

 

Air being sucked in 

increase liquid level 
check if suction pipe is vacuum-tight 

 

 

 

Air being sucked in through shaft sealing 

clean sealing pipe 
increase sealing pressure 
replace shaft sealing 

 

 

Direction of rotation is wrong 

swap over two phases of power supply (to be done by an 
electrician) 

 

 

 

 

Inner components suffering from wear 

replace worn parts 

 

 

 

Density and/or viscosity of liquid handled is too high 

seek assistance 

 

  Stuffing box not straight 

tighten evenly 

 

Stuffing box is fastened too tight resp. shaft sealing is worn  loosen stuffing box  

replace packing and/or mechanical seal 
check sealing, flushing and cooling pipes (pressure) 
avoid dry running 

 

  Lines and roughness on shaft or shaft sleeve 

replace parts 

 

  Unsuitable packing material 

use suitable material (check shaft or shaft sleeve for damage 
beforehand) 

 

  Deposits on mechanical seal 

clean 
replace mechanical seal if necessary 
if necessary provide additional rinsing or quench 

 

  Impeller out of balance 

remove blocks/deposits 
replace impeller if broken or unevenly worn 
check shafts to ensure that they are running true 

 

 

  Coupling not aligned 

align pump unit better 

 

 

Coupling distance too small 

change 

 

 

 

 

  Forces in pipeline too high (pump unit under strain) 

change (support pipes, use compensators, etc.) 
is foundation plate/frame properly cast in place? 

 

Too much, too little or the wrong type of lubricant 

change 

 

Electricity supply not right (2-phase running) 

check voltage of all phases  
check cable connections and fuses 

 

Sealing insufficient 

tighten screws 
replace sealing 

 

 

Bearing damaged 

replace 
check lubricant and bearing space for pollutants (rinse oil area) 

 

Relief fittings insufficient 

clean relief openings in impeller 
replace worn parts (impeller, split rings) 
adjust in line with the system pressure/intake pressure given on 
ordering 

 

System-related vibrations (resonance) 

seek assistance 

Содержание Lowara LS Series

Страница 1: ...920 en Volute Casing Pumps Model LS LC LCP Installation Operation and Maintenance Instruction Translation of the Original Operation Manual en Keep for further use Pay attention to this operating instr...

Страница 2: ...Xylem Service Austria GmbH Ernst Vogel Stra e 2 A 2000 Stockerau Telefon 43 0 2266 604 Fax 43 0 2266 65311 E Mail info austria xyleminc com Internet www xylemaustria com...

Страница 3: ...Handling Storage 9 4 1 Transport Handling 9 4 2 Storage Conservation 10 5 Mounting Installation 10 5 1 Mounting of Pump Unit 10 5 2 Connection of Pipings to the Pump 10 5 3 Coupling 11 5 4 Drive 12 5...

Страница 4: ...ies to the manufacturer resp orders of spare ATEX Label only for pumps in compliance with EC directive 94 9 EG CE Marking of compliance with the EC directive 94 9 EG Ex specific marking for explosion...

Страница 5: ...ir work during the guarantee period may only be carried out by us or subject to our written approval Otherwise the guarantee ceases to apply Longer term guarantees basically only cover correct handlin...

Страница 6: ...danger to people or the environment The provisions of the law must be observed Measures should be taken to exclude any danger from electricity e g by complying with the local regulations on electrica...

Страница 7: ...n t cause additional increase of surface temperature at the pump Furthermore the references in chapter 6 of these operating Instructions must be taken into consideration On pumps with mech seals the p...

Страница 8: ...is is valid for the operation as well as for the standstill of the pump and therefore for all possible pressures and temperatures of the unit 2 8 3 NPSH The pumped liquid must have a min pressure NPSH...

Страница 9: ...ng with barrier by pumped fluid P3 Packing with lantern ring with barrier by external fluid P4 Packing with lantern ring with flush P5 Packing without lantern ring with external cooling Position 4 Mat...

Страница 10: ...76 0 75 5 76 5 76 5 90 0 77 0 76 5 77 5 77 5 110 0 78 0 77 5 77 0 79 0 78 5 80 0 132 0 79 0 78 5 78 0 79 5 79 5 80 0 160 0 80 0 79 5 79 0 80 5 81 0 80 5 200 0 81 5 81 0 80 5 81 5 82 0 83 0 250 0 82 5...

Страница 11: ...200 6000 5400 6700 10450 3250 2300 2650 4800 200 400 250 8350 7450 6750 13050 4450 3150 3650 6550 200 6000 5400 6700 10450 3250 2300 2650 4800 200 500 250 8350 7450 6750 13050 4450 3150 3650 6550 200...

Страница 12: ...ufficient firmness acc to DIN 1045 or equal standard min BN 15 to ensure a secure functional mounting The concrete foundation must have set before the unit is erected Its surface must be horizontal an...

Страница 13: ...ed in the suction intake pipe when the motor is being started up If the pipe system is tested with the pump installed do not exceed the maximum permitted casing pressure of the pump and or shaft seali...

Страница 14: ...available and correct if necessary Pay attention to chapter 6 beforehand It must be possible to turn the unit easily and harmoniously by hand Improper alignment of the unit can lead to damages at coup...

Страница 15: ...ty devices are operational Switch on any sealing flushing or cooling devices that are provided See data sheet for quantity and pressure Open valve in suction intake pipe Set discharge side valve to ap...

Страница 16: ...valid 6 5 Lubrication of Bearings 6 5 1 Oil lubrication The bearing bracket must be filled up with oil For quality of oil refer to chapter 7 4 1 For quantity of oil refer to chapter 7 4 1 The pumps a...

Страница 17: ...ooled down If there is any risk of freezing empty pump cooling areas and pipes completely If the pump also remains under operating conditions pressure and temperature when stationary leave all sealing...

Страница 18: ...ure 46 4 mm 2 s 175 C 15 C higher than permitted bearing temperature For ambient temperatures under 10 C another suitable type of lubrication oil must be used Request required Oil quantity Bearing bra...

Страница 19: ...isassembled pumps units or single parts against tipping over or rolling off While disassembling the pump use of an open flame blowlamp etc only when there is no danger of setting fire cause an explosi...

Страница 20: ...100S Unscrew the hexagon nuts M8 and demount the bearing cover 12 P Loosen and remove the hexagon screws S6 remove the bearing cover 12 Move the shaft 24 with the pair of angular contact bearings K2...

Страница 21: ...ng the reverse order of steps as completed for pump disassembly However the following observations should be considered Pay attention to the utmost cleanliness when reassembling the pump For tight tol...

Страница 22: ...arings aso 2 To ensure optimum availability we recommend that suitable quantities of spare parts are held in stock especially if these are made from special materials and in the case of mechanical sea...

Страница 23: ...liquid level check if suction pipe is vacuum tight Air being sucked in through shaft sealing clean sealing pipe increase sealing pressure replace shaft sealing Direction of rotation is wrong swap ove...

Отзывы: