7.6 Cleaning of pump 

 

The pump must not be cleaned with pressurised 
water - water will get into the bearings.

 

 

 

 

Dirt on the outside of the pump has an adverse 
effect on transmission of heat. The pump should 

therefore be cleaned with water at regular 
intervals (depending on the degree of dirt). 

 

Radial-Shaft sealing (WD1 and WD2) are not 
completely free from leakage. Impurities could 
cause leakage at the shaft sealing area of the 
frame. Therefore wipe off impurities with a rag 
from time to time. 

 

Replace dirty oil level sight glass (ÖA). 

 

8. Dismantling and repair of pump 

8.1 General remarks 

 

 

Repair to the pump or pump system may only 
be carried out by authorised skilled personnel or 
by the manufacturer’s specialist staff.

 

 

 

When disassembling the pump pay attention to

 

chapter 2 and chapter 4.1.

 

 

For mounting and repair you can order specialized 
personnel if you want. 

 

 

If dangerous liquids are pumped the appropriate 
disposal of the handled liquid is necessary 
before the disassembly of the pump. Pay 
attention to the fact, that even in drained pumps 
there are remainders of the handled liquid. If 
necessary the pump must be flushed or 
decontaminated. Laws must be observed, 
otherwise danger to health is existing!

 

 

 

Before the disassembly the pump has to be 
secured in such a way, that it can’t be started. 

 

The pump casing must be drained and without 
pressure. 

 

All locking devices in the suction-  and discharge-
pipe must be closed. 

 

All parts must have taken on the temperature of 
the environment. 

 

 

Secure disassembled pumps, units or single 
parts against tipping over or rolling off.

 

 

 

While disassembling the pump use of an open 
flame (blowlamp, etc.) only, when there is no 
danger of setting fire, cause an explosion or 
cause injurious vapours. 
Never apply heat to remove the impeller nut. 
Use of heat may result in severe physical injury 
and property damage.

 

 

 

Use original spare parts only. Pay attention to 
the right materials and the matching design.

 

 

8.2 General 

 

 

Works, which require shocks (hammer), must 
only be performed outside the explosive 
atmosphere or only non-sparking tools must be 
used.

 

 

Carry out disassembly and mounting according to the 
appropriate sectional drawing. 
You will only need common tools. 

Before disassembly check if required parts are ready. 
Disassemble the pump only so far, as required for the 
replacement of the repair part. 

 

8.3 Disassembly of Back Pull Out 
Assembly 

The Back Pull Out Assembly includes all parts of the 
pump except the volute casing (4). As the pumps are 
constructed for process design the volute casing (4) 
can stay on the base frame and in the pipes, unless 
the volute casing itself must be repaired. 

 

Drain volute casing (4) through the drain plug (E). 

 

Unscrew all auxiliary piping (flush, cooling, 
quench, a.s.o.) and drain lubrication oil from 
bearing bracket (10) via the screwed oil plug (AS). 

 

Remove coupling guard. 

 

Remove spacer of the spacer type coupling (if 
available). Remove motor at standard coupling. 

 

Loosen screws for support foot (80/F) from the 
base frame. 

 

Hang the Back Pull Out Assembly onto a lifting 
device, so that it won’t sink down or press into the 
volute casing during the dismounting. Example 
see picture 9 for lifting recommendations. 

 

 

 

 

               pic 9 

 

 

Loosen casing screws (hexagon nuts "M1"). 

 

Using the possibly available jack screws, separate 
the Back Pull Out Assembly from the casing. 

 
 

Содержание Lowara LS Series

Страница 1: ...920 en Volute Casing Pumps Model LS LC LCP Installation Operation and Maintenance Instruction Translation of the Original Operation Manual en Keep for further use Pay attention to this operating instr...

Страница 2: ...Xylem Service Austria GmbH Ernst Vogel Stra e 2 A 2000 Stockerau Telefon 43 0 2266 604 Fax 43 0 2266 65311 E Mail info austria xyleminc com Internet www xylemaustria com...

Страница 3: ...Handling Storage 9 4 1 Transport Handling 9 4 2 Storage Conservation 10 5 Mounting Installation 10 5 1 Mounting of Pump Unit 10 5 2 Connection of Pipings to the Pump 10 5 3 Coupling 11 5 4 Drive 12 5...

Страница 4: ...ies to the manufacturer resp orders of spare ATEX Label only for pumps in compliance with EC directive 94 9 EG CE Marking of compliance with the EC directive 94 9 EG Ex specific marking for explosion...

Страница 5: ...ir work during the guarantee period may only be carried out by us or subject to our written approval Otherwise the guarantee ceases to apply Longer term guarantees basically only cover correct handlin...

Страница 6: ...danger to people or the environment The provisions of the law must be observed Measures should be taken to exclude any danger from electricity e g by complying with the local regulations on electrica...

Страница 7: ...n t cause additional increase of surface temperature at the pump Furthermore the references in chapter 6 of these operating Instructions must be taken into consideration On pumps with mech seals the p...

Страница 8: ...is is valid for the operation as well as for the standstill of the pump and therefore for all possible pressures and temperatures of the unit 2 8 3 NPSH The pumped liquid must have a min pressure NPSH...

Страница 9: ...ng with barrier by pumped fluid P3 Packing with lantern ring with barrier by external fluid P4 Packing with lantern ring with flush P5 Packing without lantern ring with external cooling Position 4 Mat...

Страница 10: ...76 0 75 5 76 5 76 5 90 0 77 0 76 5 77 5 77 5 110 0 78 0 77 5 77 0 79 0 78 5 80 0 132 0 79 0 78 5 78 0 79 5 79 5 80 0 160 0 80 0 79 5 79 0 80 5 81 0 80 5 200 0 81 5 81 0 80 5 81 5 82 0 83 0 250 0 82 5...

Страница 11: ...200 6000 5400 6700 10450 3250 2300 2650 4800 200 400 250 8350 7450 6750 13050 4450 3150 3650 6550 200 6000 5400 6700 10450 3250 2300 2650 4800 200 500 250 8350 7450 6750 13050 4450 3150 3650 6550 200...

Страница 12: ...ufficient firmness acc to DIN 1045 or equal standard min BN 15 to ensure a secure functional mounting The concrete foundation must have set before the unit is erected Its surface must be horizontal an...

Страница 13: ...ed in the suction intake pipe when the motor is being started up If the pipe system is tested with the pump installed do not exceed the maximum permitted casing pressure of the pump and or shaft seali...

Страница 14: ...available and correct if necessary Pay attention to chapter 6 beforehand It must be possible to turn the unit easily and harmoniously by hand Improper alignment of the unit can lead to damages at coup...

Страница 15: ...ty devices are operational Switch on any sealing flushing or cooling devices that are provided See data sheet for quantity and pressure Open valve in suction intake pipe Set discharge side valve to ap...

Страница 16: ...valid 6 5 Lubrication of Bearings 6 5 1 Oil lubrication The bearing bracket must be filled up with oil For quality of oil refer to chapter 7 4 1 For quantity of oil refer to chapter 7 4 1 The pumps a...

Страница 17: ...ooled down If there is any risk of freezing empty pump cooling areas and pipes completely If the pump also remains under operating conditions pressure and temperature when stationary leave all sealing...

Страница 18: ...ure 46 4 mm 2 s 175 C 15 C higher than permitted bearing temperature For ambient temperatures under 10 C another suitable type of lubrication oil must be used Request required Oil quantity Bearing bra...

Страница 19: ...isassembled pumps units or single parts against tipping over or rolling off While disassembling the pump use of an open flame blowlamp etc only when there is no danger of setting fire cause an explosi...

Страница 20: ...100S Unscrew the hexagon nuts M8 and demount the bearing cover 12 P Loosen and remove the hexagon screws S6 remove the bearing cover 12 Move the shaft 24 with the pair of angular contact bearings K2...

Страница 21: ...ng the reverse order of steps as completed for pump disassembly However the following observations should be considered Pay attention to the utmost cleanliness when reassembling the pump For tight tol...

Страница 22: ...arings aso 2 To ensure optimum availability we recommend that suitable quantities of spare parts are held in stock especially if these are made from special materials and in the case of mechanical sea...

Страница 23: ...liquid level check if suction pipe is vacuum tight Air being sucked in through shaft sealing clean sealing pipe increase sealing pressure replace shaft sealing Direction of rotation is wrong swap ove...