1.4.2.
Delivery Inspection
-
Before starting the installation and before unpacking the unit from the box, it is necessary to check for any
traces of damage on the packaging. If the packaging is damaged, write a record of the damage and contact
your carrier, please.
-
Check if you have received the product actually ordered by you. After unpacking, check that the unit and
other components are in order. Please, report any discrepancy with the order to the supplier immediately.
If an order complaint is not made immediately after delivery, it will not be considered later.
1.4.3.
Storage
-
If you do not plan to install the unit immediately after purchase, it must be stored in an indoor, non-
condensing environment at temperatures ranging b5 to +40 °C. If the product is transported at
temperatures below 0 °C, it must be put into the working environment where it will be installed for at
least 2 hours after unpacking.
1.5.
Contents of the Xhouse unit package
-
Xhouse unit with design cover
1x
-
Siphon hose
Ø
18/14-1000 mm for condensate drainage
1x
-
2.5x120tie strap
2x
-
Quick safety data sheet
1x
-
Serial plate
1x
-
Energy label
1x
1.6.
Before Commencing the Installation
-
Before commencing the installation, we recommend that you attach the serial plate (by default, supplied
with the package) to the operating documentation (e.g.: equipment operating book, etc.), which is
subsequently kept for a later maintenance records and servicing.
-
Check that there are no electrical or other lines (e.g. gas, water, etc.) at the point of installation of the
unit on the wall that could be damaged during installation.
-
Ensure that the installation of the unit, including the openings in the wall for the passage of the
connection pipe, does not compromise the building's structure and meets all the legislative safety
requirements.
-
Check the solution for draining the unit's condensate into the sewer system or in another way that ensures
smooth condensate drainage
Technical Parameters
1.7.
Xhouse unit design
1
2
3
4
18
17
16
Fig. 1
Содержание XHOUSE-300
Страница 8: ...8 Version 1 GBR 25 10 2022 D 502 0287 5x 6 7 5 8 9 Fig 2 5 8 19 Fig 3...
Страница 9: ...9 Version 1 GBR 25 10 2022 D 502 0287 10 11 12 14 13 20 21 15 Fig 4 Fig 5...
Страница 31: ...31 Version 1 GBR 25 10 2022 D 502 0287 4 3 Block diagram of the Xhouse unit wiring Fig 38...
Страница 34: ...34 Version 1 GBR 25 10 2022 D 502 0287 5 4 2 Description of the functions of the buttons and regulation Tab 14...