40
Version 1 – GBR (25/10/2022)
D-502-0287
-
Hang a plastic design cover on the plastic spikes located in the unit body
-
At the bottom of the unit, there secure the cover (2x M6x20 screws) with adequate force - by hand, so
that the cover does not loosen spontaneously, but at the same time does not get destroyed - deformed.
6.3.
Reset filter countdown
-
Resetting the filter is always done after the red indicator light 5 is on. FILTER.
-
Reset the filter in the normal operating state of the unit (sleeping or control regime):
o
Press button 4 and button 6 at the same time.
o
After approx. 4 s, red light 5 FILTER will go out. This will reset the timer and restart the fan running
time.
-
If the filters are not properly replaced (cleaned), the functionality of the unit may be reduced.
-
Never operate the unit without air filters, the recuperator may be damaged.
7.
Regular Maintenance and Cleaning of Xhouse Units
-
Before opening the unit during its maintenance and cleaning, the unit must be disconnected from the
power supply
-
Maintenance and cleaning must be performed at regular intervals; otherwise, the functionality of the
unit may be impaired.
-
Children may not perform cleaning maintenance without supervision.
-
Compressed air, steam, solvents, aggressive chemicals, abrasive cleaning agents, or sharp items must
not be used to clean the unit.
-
Perform maintenance and cleaning of the unit in regular cycles to ensure its hygienic operation.
In the case of regular filter replacement (use the manufacturer’s original filters) as indicated, the
maintenance interval of the maximum of 2 years or at intervals determined by the relevant national
regulations or practices must be observed.
-
If the unit is not used for a longer period of time, it is necessary to switch off the power supply to the unit.
-
Service work that is beyond the scope of routine maintenance may only be performed by an authorised
service centre or the manufacturer.
-
Regular maintenance must include:
o
Visual inspection of the unit casing - Chapter 7.1.1.,
o
Visual inspection of the power supply cable - Chapter 7.1.2.,
o
Cleaning of the fan chambers and fans - Chapter 7.2.1.
o
Visual inspection - cleaning of the pre-heater if it is available - Chapter 7.2.2.,
o
Visual inspection and cleaning of the heat recovery exchanger - Chapter 7.2.3.,
Fig. 50
4 s
4 s
Fig. 49
Содержание XHOUSE-300
Страница 8: ...8 Version 1 GBR 25 10 2022 D 502 0287 5x 6 7 5 8 9 Fig 2 5 8 19 Fig 3...
Страница 9: ...9 Version 1 GBR 25 10 2022 D 502 0287 10 11 12 14 13 20 21 15 Fig 4 Fig 5...
Страница 31: ...31 Version 1 GBR 25 10 2022 D 502 0287 4 3 Block diagram of the Xhouse unit wiring Fig 38...
Страница 34: ...34 Version 1 GBR 25 10 2022 D 502 0287 5 4 2 Description of the functions of the buttons and regulation Tab 14...