XTEMP ENVIRONMENTS (SHANGHAI) CO., LTD.
http://www.xtemp-usa.com/
45
/
55
DSEO0711-2-V211119/UXP8401-PG.CC.GE.AR-CD7003/5~+45
℃
Chapter 4 Maintenance
4
81 Mains fuse 83 Humidifier output
Fig 40 Checking and replacing the fuse
Always remove the mains plug from the power socket when performing checking or replacing the
fuse, and never use any fuse different from the original one. Secure the fuse once checked or
replaced. For servicing or maintenance, call authorized service engineer.
4.3 Inspection of power supply for piezoelectric elements
If no water mist generated with OUTPUT for HUMD exceeding 5% as detailed for Immediate
Constant and as shown in Fig 14, and water lever in normal condition (Fig 3) without low level
warning, perform inspection of the power supply for the piezoelectric elements as follows:
70 Ultra-sonic generator for piezoelectric elements 75 Power transformer
Fig 41 Power transformer and power supply for piezoelectric elements