26
www.XSscuba.com
XS Scuba Inspire Regulator Service Manual
14. Clear air passageways.
A. Attach the first stage to a scuba cylinder filled to
approximately 3000 psi (200 bar). Slowly open the
cylinder to blow out any debris or contaminants that
may have entered during the assembly process.
Close the cylinder.
15. Install port plugs (30,32).
A. If there are any unused MP ports, install o-ring(s)
(31) on to MP plug (32) and install in the swivel turret
(21) to 40 in/lbs (4.5 Nm) using a 5/32” hex key
adapter.
B. Place o-ring (29) on to HP plug (30) and install into
the main body (11) to 40 in/lbs (4.5 Nm) using a 3/16”
hex key adapter.
16. Install MP regulator hose.
A. Install o-ring (31) on to male end of MP hose.
B. Install MP hose into its respective port. Using a
torque wrench and a 9/16” crow’s foot, torque the
hose to 40 in/lbs (4.5Nm).
C. Slide the hose protector back into position
This concludes Inspire First Stage Reassembly
Adjusting and Testing
1. Checking medium pressure
A. Attach the TL121 Inline Adjuster with Gauge
to the end of the MP hose. Attach a proper
functioning 2nd stage to the end of the TL121
Inline Adjuster.
B. While closely monitoring the gauge, slowly
open the cylinder valve to pressurize the
regulator.
WARNING: Before pressurizing the first
stage, you must have a proper functioning 2nd
stage or other type of automatic relief device
connected to the first stage. In the event of a
high pressure leak, it will relieve excess pressure
preventing the hose from rupturing, thus
preventing possible injury.
14A
16A
16B
15A
15A
Содержание Inspire Octopus
Страница 6: ...6 www XSscuba com XS Scuba Inspire Regulator Service Manual...
Страница 7: ...7 www XSscuba com XS Scuba Inspire Regulator Service Manual...
Страница 8: ...8 www XSscuba com XS Scuba Inspire Regulator Service Manual...
Страница 9: ...9 www XSscuba com XS Scuba Inspire Regulator Service Manual...