
02/99
5
Perform the initial commissioning of the battery(ies) 20 minutes before any
start-up attempts (see Maintenance Manual).
Minimum voltage :
8 V for a 12 V battery
18 V for a 24 V battery
- RESET :
- STOP :
- ARROWS :
- ESCAPE :
- ENTER :
- GREEN LED :
- ORANGE LED :
- RED LED :
Pressing this key will erase the message
indicating a fault.
Pressing this key will immediately shut
down the generating set and will light the
fault lamp. Restarting the genset will not
be possible until the fault has been
RESET.
In a window, the Left and Right arrows enable
access to the various options offered (see next
page for list of screens).
Pressing this key enables access to the higher
level screen (see next page for list of screens).
Pressing this key enables :
1 - Access to the value of a parameter,
2 - Validation of a command or the value of a
modified parameter.
Signals that the Progress is powered up (green
flashing).
Signals an alarm (orange blinking).
Signals a fault (red blinking).
Http://www.xinke-hk.com
ShenZhen XinKe power equipment Co .Ltd