02/99
15
GEN UnVoltage :
Threshold of undervoltage applied to phase/neutral voltage.
GEN OvFrequen :
Threshold of alternator over-frequency authorised above the rated value.
GEN UnFrequence :
Threshold of alternator under-frequency authorised below the rated value.
GEN OvCurrent :
Threshold of alternator overload authorised above the rated value.
GEN Revrse kW :
Threshold of active reverse power authorised (1 phase value).
GEN Rvrs kVAr :
Threshold of reactive reverse power authorised (1 phase value).
GEN over % THD :
Authorised threshold of total harmonic distortion.
V4 Ov Voltage :
Threshold of overvoltage on mains or bus side, applied to the phase/neutral voltage.
V4 Un Voltage :
Threshold of undervoltage on mains or bus side, applied to the phase/neutral voltage.
V4 Ov Frequen :
Threshold of over-frequency on mains or bus side which is authorised above the rated value.
V4 Un Frequen :
Threshold of under-frequency on mains or bus side which is authorised below the rated value.
Mains kW Surge :
Not used (to be set to a value higher than the genset power).
Bus kW Surge :
Reference analogue voltage for the rated speed.
Gov Volt Bias :
Phase shift authorised for the paralleling of V1 and V4 (V1 = genset phase 1 voltage – V4 = mains or bus phase 1
voltage).
SYNC Window V :
Voltage difference authorised for the paralleling of V1 and V4 (V1 = genset phase 1 voltage – V4 = mains or bus
phase 1 voltage).
SYgain V/180° :
Value of off load synchronisation gain.
>> SYg V/180° :
Value of on load synchronisation gain.
SYstbl V/Hz :
Value of stability in off load synchronisation.
>> SYs V/Hz :
Value of stability in on load synchronisation.
SYgain %P/V :
Value of synchronisation gain in off load voltage.
>> SYg %P/V :
Value of synchronisation gain in on load voltage.
LSgain V/Xre :
Value of gain in distribution of active load.
LSstbl V/Xre :
Value of stability in distribution of active load.
LSgain % P/Xap :
Value of gain in distribution of reactive load.
LSstbl % P/Xap :
Value of stability in distribution of reactive load.
Ramp +kW/Sec :
Value in kW/sec which is imposed on the generator during load transfer phases from the mains to the genset or bet-
ween gensets. Adjustment kW by kW is possible.
Ramp -kW/Sec :
Value in kW/sec which is imposed on the generator during load transfer phases from the genset to the mains or bet-
ween gensets. Adjustment kW by kW is possible.
Http://www.xinke-hk.com
ShenZhen XinKe power equipment Co .Ltd