background image

28

INTERNAL-DIAMETER MEASUREMENTS

Initial Internal Diameter (before backfilling)

________

Final Internal Diameter (after backfilling)

________

Initial Internal Diameter minus 

Final Internal Diameter = Deflection

________

Verified by:

_________________________________

1.  PREINSTALLATION

A.

Visual Inspection:

No evidence of damage (holes, cracks, gouges) in tank. (Document any damage found.) .....................................

B.

Monitoring-Fluid Tanks:

1. Check and record monitoring-fluid level in reservoir.  ..............................................................................
2. Check for monitoring fluid inside and outside of tank...............................................................................

C.

Physical Test:  

Preinstallation air/soap test completed in accordance with installation instructions.......................................................

D.

Backfill Material:  

(Indicate which type.)1. Pea gravel or crushed stone as specified by XERXES. ........................................

2. Other (Requires specific approval by XERXES – describe.).................................

E.

Excavation:  

Hole dimensions are correct per installation instructions for appropriate conditions .........................................................

F.

Internal Diameter Measurement:  

The internal diameter of the tank is measured and documented (Initial Internal Diameter in Section 4 below)..

G.

Geotextile Utilized:  

(Indicate one.)1. Yes

2. No ..........................................................................................................................

H.

Hole Condition: 

(Indicate one.)1. Dry hole (Water is not anticipated to reach tank – area is not subject to flooding.)

................

2. Wet hole (Excavation may trap water – area is subject to flooding.)......................................

I.

Traffic Loads:  

(Indicate one.)1. Traffic loads anticipated ..........................................................................................................

2. No traffic loads anticipated .....................................................................................................

J.

Anchoring: 

Performed in accordance with installation instructions.

1. Deadmen        2. Full slab...................................................

K.

Fittings and Other Metal Components: 

Coated to protect against corrosion. .....................................................................................

2.  DURING INSTALLATION

A.

Backfill-material bed is level and is a minimum of 12 inches deep, over native soil or slab, before setting tank.

......................

B.

Tank Spacing: 

Tanks are spaced correctly from each other and from excavation according to instructions.........................................

C.

Visual Inspection:  

No evidence of damage is found after setting in hole..............................................................................................

D.

Hold-down Straps:  

Positioned and secured according to installation instructions. 

(See SECTION 6.4. of Installation Manual.) .........

E.

Backfill compacted: 

Material has been tamped and/or compacted to fill all voids around tank............................................................

F.

Tank is properly ballasted during backfilling:  

(wet-hole installation only).........................................................................................

G.

Tank(s) are buried at proper depth to conform to appropriate conditions:  

(wet, dry, traffic or no traffic).......................................

3.  POSTINSTALLATION

A.

Physical Test:  

Air/soap test is completed according to installation instructions. ...................................................................................

B.

Internal Diameter Measurement:  

The internal diameter of the tank is measured and documented (Final Internal Diameter in Section 4 below).............

C.

Monitoring-Fluid Tanks:

1. Check and record monitoring-fluid level in the reservoir _________ (inches). ........................................
2. Check for monitoring fluid inside tank. .....................................................................................................

D.

Installation Manual:  

Deliver Installation Manual and Operating Guidelines to owner.  .........................................................................

1.  

______________
______________

______________

______________
______________

______________

______________
______________
______________
______________
______________

______________

______________

______________
______________

______________
______________
______________
______________
______________
______________
______________

______________
______________
______________

_____________

______________

Complete this checklist, and keep it with copies of any written authorizations for variations and/or deviations received from Xerxes.

• Date of Installation

_____________________________________

Tank Size and Capacity

___________________________________

• Tank Type  

SWT

DWT

MONITORING-FLUID      DRY

MCT

OWS  (Circle those that apply.)

UL Number __________

• Site Owner___________________________________________________________________________________________________

• Site Address _________________________________________________________________________________________________

• Installing Contractor __________________________________________________________________________________________

• On-Site Supervisor ____________________________________________________________________________________________

TANK INSTALLATION CHECKLIST

Fiberglass Underground Storage Tanks

Single-Wall (SWT), Double-Wall (DWT), Multicompartment (MCT) and Oil/Water Separators (OWS) 

STREET

CITY

STATE

ZIP

CONTRACTOR  NAME

STREET

CITY

STATE

ZIP

Verified by:

Verified by:

Verified by:

XERXES

CORPORATION

4.  DEFLECTION MEASUREMENT

All tanks must be measured to determine vertical deflection.  

Follow deflection-measurement instructions (Section 14) in the Installation Manual.  An

initial internal-diameter measurement is taken and recorded as a point of reference.  Subsequent internal-diameter measurements show tank deflection and
can be compared to the table below.  Take each measurement from the same fitting using the same procedure.

END

CENTER

END

Mark the location where internal-diameter
measurements were taken.

External Tank

Diameter

(Ft.)

Allowable

Deflection

(In.)

4

1/2

6

3/4

8

1-1/4

10

1-1/2

12

1-3/4

®

Содержание Fiberglass Underground Storage Tanks

Страница 1: ...Installation Manual and Operating Guidelines For Single Wall and Double Wall Fiberglass Underground Storage Tanks Owner should retain this manual for reference to operating guidelines...

Страница 2: ...allationTesting p 18 9 1 General Section 10 Ballasting p 19 10 1 General Section 11 Piping andVenting p 19 11 1 Internal Piping 11 2 External Piping 11 3 Venting Tank 11 4 Venting Interstitial Space S...

Страница 3: ...6 Careless activity or reckless operation of equipment can cause death serious injury or property damage 1 2 GENERAL 1 2 1 It is important to follow the procedures and instructions in this manual in o...

Страница 4: ...uated on top of the tank in its upright position FIGURE 2 1 30 Max 1 2 8 Federal state and local codes and regulations always take precedence over a Xerxes requirement 1 2 9 Xerxes must authorize in w...

Страница 5: ...too much momentum Momentum can grow because fittings on top of the tank make it top heavy Make sure the tank s fittings and manways never touch the ground Do not rotate the tank more than 120 from the...

Страница 6: ...serious injury 3 1 9 Refer to the appropriate section below for instructions for the following situations 3 1 9 1 For testing a single wall tank see SECTION 3 2 3 1 9 2 For testing a double wall tank...

Страница 7: ...terstitial space by itself may damage the primary tank or cause tank failure 3 3 3 2 Free the hose from the service fitting by cutting the nylon tie 3 3 3 3 Insert the hose into the quick disconnect f...

Страница 8: ...ct the air supply line 3 4 1 9 Soap all service fittings and manways Watch for active air bubbles which indicate a leak Look through the laminate for any active air bubbles rising to the top Their pre...

Страница 9: ...eeded for the test manifolds Follow instructions in Point 3 1 5 See FIGURE 3 6 and FIGURE 3 7 3 6 1 3 Before doing the air test of the base tank described in SECTION 3 6 2 and the air test of the end...

Страница 10: ...r End Tank End Tank End Tank Lifting Lug Typical Manway with Fittings Optional Reservoir Monitor Fitting Base Tank 9 FIGURE 3 12 FIGURE 3 13 3 7 2 AIR TEST OF BASE TANK 3 7 2 1 Connect the pressure so...

Страница 11: ...Disconnect the air supply line 3 8 3 4 Soap all service fittings and manways Watch for active air bubbles which indicate a leak Look through the laminate for any active air bubbles rising to the top T...

Страница 12: ...d result in death or serious injury 5 1 GENERAL 5 1 1 The installing contractor must take all precautions necessary to protect employees working in or near a tank excavation These precautions should i...

Страница 13: ...vide sufficient clearance to allow the deadmen to be set outside of the tank shadow See FIGURE 5 3 FIGURE 5 3 5 2 2 STABLE IN SITU NATIVE SOIL CONDITIONS 5 2 2 1 Where shoring is not required to maint...

Страница 14: ...ced concrete beam 6 1 2 The length of the deadman is typically equal to the length of the tank 6 1 3 A deadman may be fabricated in multiple sections as long as the total length is not decreased and e...

Страница 15: ...for further information 6 1 8 Lay the deadmen in the excavation parallel to the tank and outside of the tank shadow See FIGURE 5 3 6 1 9 In multiple tank installations with deadmen each tank will have...

Страница 16: ...must be used on all marked hold down locations Do not place straps between ribs except on 4 foot diameter tanks Failure to properly place straps may result in tank damage 6 4 4 Data for hold down stra...

Страница 17: ...p as near the loop or thimble as possible turn nuts on second clip firmly but do not tighten initially See FIGURE 6 4 6 5 15 When more than two clips are required space additional clips equally betwee...

Страница 18: ...ce one 12 inch lift of approved backfill material evenly around the tank From the edge of the hole or the top of an adjacent tank push the backfill in place by using a nonmetal probe long enough to re...

Страница 19: ...osed areas of the tank and all fittings and monitoring the pressure for one hour 9 1 4 Carefully relieve the pressure in the tank Remove the quick disconnect assembly from dry double wall tanks 12 Do...

Страница 20: ...inches 6 inches for 12 foot diameter tanks from the tank bottom All metal fittings and other metal components must be coated to protect against corrosion 11 1 2 Refer to FIGURE 11 1 along with TABLE 1...

Страница 21: ...d in SECTION 5 13 1 6 When the tank has been backfilled to subgrade before placement of asphalt or concrete take a measurement of the internal diameter of the tank See SECTION 14 of the Installation M...

Страница 22: ...4 3 1 Place the dipstick into a service fitting with a standpipe 14 3 2 Measure and record the distance from the tank bottom to the top of the standpipe 14 3 3 Pull the dipstick up until the nail catc...

Страница 23: ...l the UST coordinator at the Xerxes plant nearest you 15 4 1 6 If a tank is sloped the reservoir should be at the high end 15 4 1 7 In a tank with the interstice filled with monitoring fluid Xerxes re...

Страница 24: ...and vapors Do not pressurize the ACR assembly after installation is completed The ACR system is an enclosed space Hazardous fumes may be present so precautions should be taken to properly vent the sp...

Страница 25: ...ion process 16 5 3 TESTING ACR WT RISER TOP 16 5 3 1 Water test the riser top after the adhesive sealant in the groove at the top of the riser has sufficiently set 16 5 3 2 Plug any wall penetrations...

Страница 26: ...The contractor must install a concrete form to allow a minimum 3 inch clearance between the concrete pad street box frame and the riser top 16 7 3 Backfill to the top of the ACR system 16 7 4 Backfil...

Страница 27: ...ion such as automatic shut off devices flapper valves or vent restriction devices ball float valves which will close off the internal piping and reduce the tank s capacity 18 2 5 Owner operator must n...

Страница 28: ...ice TRUCHEK Hydrostatic Monitoring System brochure 20 1 1 2 Among those materials available from technical support at Xerxes Minneapolis are Alternate Backfill Supplemental Instructions UST Deep Buria...

Страница 29: ...d according to installation instructions B InternalDiameterMeasurement Theinternaldiameterofthetankismeasuredanddocumented FinalInternalDiameterinSection4below C Monitoring Fluid Tanks 1 Check and rec...

Страница 30: ...369 10 4 10 4 21 5 1 4 21 5 1 4 3 200 4 500 6 200 12 000 12 068 11 849 10 4 10 4 24 1 4 24 1 4 3 600 5 000 7 000 15 000 15 248 14 976 10 4 10 4 29 5 3 4 29 5 3 4 4 500 6 100 8 600 10 20 000 20 055 19...

Страница 31: ...Iowa Phone 563 886 6172 Fax 563 886 2042 Corporate Office 7901 Xerxes Avenue South Minneapolis MN 55431 Phone 952 887 1890 Fax 952 887 1870 www xerxescorp com Manufacturing Facilities 2001 Xerxes Corp...

Отзывы: