FIGURE 6-6

6.7. ALTERNATE ANCHORING METHODS IN WET-HOLE
INSTALLATIONS

6.7.1. In wet-hole installations, when Xerxes’ preferred method
of man-out-of-hole anchoring is not available, the following
methods may be used.

6.7.1.1. With both methods, place the hold-down strap between
the wire rope and the tank so that the wire rope is never in direct
contact with the tank.

6.7.1.2. The H-shaped positioning clips around the strap are
designed to accommodate the wire rope on top of the strap

as shown in FIGURE 6-7 and FIGURE 6-8.

6.7.1.3. The following method is 

shown in FIGURE 6-7

:

• attach a wire rope to each end of each hold-down strap;
• secure the termination of the wire rope 

(See SECTION 6.5.

for suggested method.)

;

• center each hold-down strap on each rib marked with the

arrowhead symbols 

;

• place the deadmen on top of the wire ropes on each side of

the tank;

• lower the deadmen to the bottom of the excavation;
• take the slack out of each wire rope and splice the termination

of the wire ropes on top of the tank

(See SECTION 6.5.)

.

FIGURE 6-7

Strap

Strap

Load Binder

Tank

12"

Xerxes
Deadman

16

FIGURE 6-4

6.5.13. When two clips are required, apply the second clip as
near the loop or thimble as possible. 

(See FIGURE 6-4.)

6.5.14. When more than two clips are required, apply the
second clip as near the loop or thimble as possible, turn nuts on
second clip firmly, but do not tighten initially. 

(See FIGURE 6-4.)

6.5.15. When more than two clips are required, space additional
clips equally between the first two, take up rope slack, and
tighten nuts on each U-bolt evenly.

6.5.16. Tighten all hardware uniformly and follow the manufac-
turer’s torque specifications. Double-check the tightness once
the anchoring system is complete.

6.5.17. If forming a loop in the wire rope, a splice is required for
connecting the two ends together. Standard rigging practice for
splicing wire rope calls for using twice the number of clips
recommended for a single-end termination. Use a minimum of
four clips for a 3/8-inch wire rope and a minimum of six clips for
a 1/2-inch wire rope. Place the rope ends parallel to each other
and install the clips 

as shown in FIGURE 6-5.

FIGURE 6-5

6.6. MAN-OUT-OF-HOLE ANCHORING

6.6.1. The Xerxes man-out-of-hole (MOH) strapping system is
designed for use in installations where water is in the excavation
and/or where personnel may not enter the hole because of site
restraints. An MOH strapping system can be, but need not be,
used in conjunction with Xerxes deadmen.

6.6.2. When using the MOH strapping system, the placement of
components is critical. 

(See FIGURE 6-6.)

1/2" Wire Rope

3/8" Wire Rope

Dead End

Live End

Load

Dead End

Live End

Load

Dead End

Live End

Load

Dead End

Live End

Load

Dead End

Live End

Loop

1

st

Clip

3

rd

Clip

2

nd

Clip

Thimble

Содержание Fiberglass Underground Storage Tanks

Страница 1: ...Installation Manual and Operating Guidelines For Single Wall and Double Wall Fiberglass Underground Storage Tanks Owner should retain this manual for reference to operating guidelines...

Страница 2: ...allationTesting p 18 9 1 General Section 10 Ballasting p 19 10 1 General Section 11 Piping andVenting p 19 11 1 Internal Piping 11 2 External Piping 11 3 Venting Tank 11 4 Venting Interstitial Space S...

Страница 3: ...6 Careless activity or reckless operation of equipment can cause death serious injury or property damage 1 2 GENERAL 1 2 1 It is important to follow the procedures and instructions in this manual in o...

Страница 4: ...uated on top of the tank in its upright position FIGURE 2 1 30 Max 1 2 8 Federal state and local codes and regulations always take precedence over a Xerxes requirement 1 2 9 Xerxes must authorize in w...

Страница 5: ...too much momentum Momentum can grow because fittings on top of the tank make it top heavy Make sure the tank s fittings and manways never touch the ground Do not rotate the tank more than 120 from the...

Страница 6: ...serious injury 3 1 9 Refer to the appropriate section below for instructions for the following situations 3 1 9 1 For testing a single wall tank see SECTION 3 2 3 1 9 2 For testing a double wall tank...

Страница 7: ...terstitial space by itself may damage the primary tank or cause tank failure 3 3 3 2 Free the hose from the service fitting by cutting the nylon tie 3 3 3 3 Insert the hose into the quick disconnect f...

Страница 8: ...ct the air supply line 3 4 1 9 Soap all service fittings and manways Watch for active air bubbles which indicate a leak Look through the laminate for any active air bubbles rising to the top Their pre...

Страница 9: ...eeded for the test manifolds Follow instructions in Point 3 1 5 See FIGURE 3 6 and FIGURE 3 7 3 6 1 3 Before doing the air test of the base tank described in SECTION 3 6 2 and the air test of the end...

Страница 10: ...r End Tank End Tank End Tank Lifting Lug Typical Manway with Fittings Optional Reservoir Monitor Fitting Base Tank 9 FIGURE 3 12 FIGURE 3 13 3 7 2 AIR TEST OF BASE TANK 3 7 2 1 Connect the pressure so...

Страница 11: ...Disconnect the air supply line 3 8 3 4 Soap all service fittings and manways Watch for active air bubbles which indicate a leak Look through the laminate for any active air bubbles rising to the top T...

Страница 12: ...d result in death or serious injury 5 1 GENERAL 5 1 1 The installing contractor must take all precautions necessary to protect employees working in or near a tank excavation These precautions should i...

Страница 13: ...vide sufficient clearance to allow the deadmen to be set outside of the tank shadow See FIGURE 5 3 FIGURE 5 3 5 2 2 STABLE IN SITU NATIVE SOIL CONDITIONS 5 2 2 1 Where shoring is not required to maint...

Страница 14: ...ced concrete beam 6 1 2 The length of the deadman is typically equal to the length of the tank 6 1 3 A deadman may be fabricated in multiple sections as long as the total length is not decreased and e...

Страница 15: ...for further information 6 1 8 Lay the deadmen in the excavation parallel to the tank and outside of the tank shadow See FIGURE 5 3 6 1 9 In multiple tank installations with deadmen each tank will have...

Страница 16: ...must be used on all marked hold down locations Do not place straps between ribs except on 4 foot diameter tanks Failure to properly place straps may result in tank damage 6 4 4 Data for hold down stra...

Страница 17: ...p as near the loop or thimble as possible turn nuts on second clip firmly but do not tighten initially See FIGURE 6 4 6 5 15 When more than two clips are required space additional clips equally betwee...

Страница 18: ...ce one 12 inch lift of approved backfill material evenly around the tank From the edge of the hole or the top of an adjacent tank push the backfill in place by using a nonmetal probe long enough to re...

Страница 19: ...osed areas of the tank and all fittings and monitoring the pressure for one hour 9 1 4 Carefully relieve the pressure in the tank Remove the quick disconnect assembly from dry double wall tanks 12 Do...

Страница 20: ...inches 6 inches for 12 foot diameter tanks from the tank bottom All metal fittings and other metal components must be coated to protect against corrosion 11 1 2 Refer to FIGURE 11 1 along with TABLE 1...

Страница 21: ...d in SECTION 5 13 1 6 When the tank has been backfilled to subgrade before placement of asphalt or concrete take a measurement of the internal diameter of the tank See SECTION 14 of the Installation M...

Страница 22: ...4 3 1 Place the dipstick into a service fitting with a standpipe 14 3 2 Measure and record the distance from the tank bottom to the top of the standpipe 14 3 3 Pull the dipstick up until the nail catc...

Страница 23: ...l the UST coordinator at the Xerxes plant nearest you 15 4 1 6 If a tank is sloped the reservoir should be at the high end 15 4 1 7 In a tank with the interstice filled with monitoring fluid Xerxes re...

Страница 24: ...and vapors Do not pressurize the ACR assembly after installation is completed The ACR system is an enclosed space Hazardous fumes may be present so precautions should be taken to properly vent the sp...

Страница 25: ...ion process 16 5 3 TESTING ACR WT RISER TOP 16 5 3 1 Water test the riser top after the adhesive sealant in the groove at the top of the riser has sufficiently set 16 5 3 2 Plug any wall penetrations...

Страница 26: ...The contractor must install a concrete form to allow a minimum 3 inch clearance between the concrete pad street box frame and the riser top 16 7 3 Backfill to the top of the ACR system 16 7 4 Backfil...

Страница 27: ...ion such as automatic shut off devices flapper valves or vent restriction devices ball float valves which will close off the internal piping and reduce the tank s capacity 18 2 5 Owner operator must n...

Страница 28: ...ice TRUCHEK Hydrostatic Monitoring System brochure 20 1 1 2 Among those materials available from technical support at Xerxes Minneapolis are Alternate Backfill Supplemental Instructions UST Deep Buria...

Страница 29: ...d according to installation instructions B InternalDiameterMeasurement Theinternaldiameterofthetankismeasuredanddocumented FinalInternalDiameterinSection4below C Monitoring Fluid Tanks 1 Check and rec...

Страница 30: ...369 10 4 10 4 21 5 1 4 21 5 1 4 3 200 4 500 6 200 12 000 12 068 11 849 10 4 10 4 24 1 4 24 1 4 3 600 5 000 7 000 15 000 15 248 14 976 10 4 10 4 29 5 3 4 29 5 3 4 4 500 6 100 8 600 10 20 000 20 055 19...

Страница 31: ...Iowa Phone 563 886 6172 Fax 563 886 2042 Corporate Office 7901 Xerxes Avenue South Minneapolis MN 55431 Phone 952 887 1890 Fax 952 887 1870 www xerxescorp com Manufacturing Facilities 2001 Xerxes Corp...

Отзывы: