Circuit Description
WorkCentre Pro 412
Launch Issue
5-36
August 2001
A R3 limits AC current and controls upper and lower REN meter.
5-8 SMPS (Switching Mode Power Supply) Unit.
5-8-1 SMPS Specifications
There are no user-serviceable parts inside the SMPS unit.
The SMPS (Switching Mode Power Supply) unit used here is a PWM (Pulse Width Modulation) type power
supply unit that supplies DC+5V to controller and control panel, and DC+5V, DC+24V and DC+12V to the
engine. It also supplies AC power to fixer heat lamp.
No
.
Output Channel
Ch.1
Ch.2
Ch.3
1
Channel name
+5.1V
+24.0V
+12.0V
2
Rated output voltage
+5.1V
+24.0V
+12.0V
3
Rate output current
2A
2.5A
1.0A
4
Maximum load current
and
load pattern
3A continuous
3.5A continuous
1.0A continuous
5
Load change range
0.5~2.0A
0.3~2.5A
0.2~1.0A
6
Rate output voltage
(For rated I/O)
+5.1V±5%
(+4.84 to +5.35V)
+24.0V±10%
(+21.60 to
+26.40V)
+12V±5%
(+11.40 to
+12.60V)
7
1) Total output voltage
deviation
(Input, load, temp.,
aging)
2) Dynamic input
change
3) Dynamic load
change
Including all
+5.1V±5%
(+4.84 to +5.35V)
including set error
Including all
+24.0V±10%
(+21.60 to
+26.40V)
including set
error
Including all
+12V±5%
(+11.40 to
+12.60V)
including set
error
8
Refer to ripple & noise
27)
150mVp-p or less
500mVp-p or
less
150mVp-p or less
Содержание WorkCentre Pro 412
Страница 18: ...Introduction WorkCentre Pro 412 August 2001 1 14 Launch Issue This page intentionally blank...
Страница 22: ...Precautions WorkCentre Pro 412 Launch Issue 3 2 August 2001 This page intentionally blank...
Страница 82: ...Disassembly and Reassembly WorkCentre Pro 412 Launch Issue 6 18 August 2001 This page intentionally blank...
Страница 99: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 17 August 2001 No Image...
Страница 100: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 18 August 2001...
Страница 101: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 19 August 2001 All Black...
Страница 102: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 20 August 2001 Vertical White Line Band...
Страница 103: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 21 August 2001 Dark Image...
Страница 104: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 22 August 2001 Background...
Страница 105: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 23 August 2001 Ghost...
Страница 106: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 24 August 2001 Black Dot...
Страница 107: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 25 August 2001 Horizontal Band...
Страница 108: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 26 August 2001 Irregular Density...
Страница 109: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 27 August 2001 White Spot...
Страница 111: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 29 August 2001 Poor Fusing...
Страница 114: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 32 August 2001 No Power No LCD or LEDs...
Страница 115: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 33 August 2001 Fuser Error...
Страница 116: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 34 August 2001 Paper Jam Mis feeding...
Страница 117: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 35 August 2001 Paper Jam Jam 1...
Страница 118: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 36 August 2001 Engine Error...
Страница 122: ...Exploded View Parts List WorkCentre Pro 412 Launch Issue 8 4 August 2001 8 2 Platen Ass y Exploded View Parts List...
Страница 127: ...Exploded View Parts List WorkCentre Pro 412 Launch Issue 8 9 August 2001 This page intentionally blank...
Страница 131: ...Exploded View Parts List WorkCentre Pro 412 Launch Issue 8 13 August 2001 This page intentionally blank...
Страница 150: ...Exploded View Parts List WorkCentre Pro 412 Launch Issue 8 32 August 2001 This page intentionally blank...
Страница 163: ...Block Diagram WorkCentre Pro 412 Launch Issue 10 1 August 2001 10 Block Diagram...
Страница 164: ...Block Daigram WorkCentre Pro 412 Launch Issue 10 2 August 2001 This page intentionally blank...
Страница 165: ...Connection Diagram WorkCentre Pro 412 Launch Issue 11 1 August 2001 11 Connection Diagram...
Страница 166: ...Connection Diagram WorkCentre Pro 412 Launch Issue 11 2 August 2001 This page intentionally blank...
Страница 168: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 2 August 2001 12 2 Main Circuit Diagram 2 of 14...
Страница 169: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 3 August 2001 12 3 Main Circuit Diagram 3 of 14...
Страница 170: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 4 August 2001 12 4 Main Circuit Diagram 4 of 14...
Страница 171: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 5 August 2001 12 5 Main Circuit Diagram 5 of 14...
Страница 172: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 6 August 2001 12 6 Main Circuit Diagram 6 of 14...
Страница 173: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 7 August 2001 12 7 Main Circuit Diagram 7 of 14...
Страница 174: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 8 August 2001 12 8 Main Circuit Diagram 8 of 14...
Страница 175: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 9 August 2001 12 9 Main Circuit diagram 9 of 14...
Страница 176: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 10 August 2001 12 10 Main Circuit Diagram 10 of 14...
Страница 177: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 11 August 2001 12 11 Main Circuit Diagram 11 of 14...
Страница 178: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 12 August 2001 12 12 Main Circuit Diagram 12 of 14...
Страница 179: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 13 August 2001 12 13 Main Circuit Diagram 13 of 14...
Страница 180: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 14 August 2001 12 14 Main Circuit Diagram 14 of 14...
Страница 181: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 15 August 2001 12 15 LIU Circuit Diagram...
Страница 182: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 16 August 2001 12 16 OPE Circuit Diagram...
Страница 183: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 17 August 2001 12 17 HVPS Circuit Diagram 1 of 2...
Страница 184: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 18 August 2001 12 18 HVPS Circuit Diagram 2 of 2...
Страница 185: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 19 August 2001 12 19 SMPS 110 Circuit Diagram...
Страница 186: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 20 August 2001 12 20 SMPS 220 Circuit Diagram...
Страница 187: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 21 August 2001 12 21 ADF Circuit Diagram...
Страница 188: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 22 August 2001 12 22 Flat Circuit Diagram...
Страница 189: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 23 August 2001 12 23 PTL Circuit Diagram...
Страница 190: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 24 August 2001 12 24 Sensor Circuit Diagram...
Страница 191: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 25 August 2001 12 25 Toner RX Circuit Diagram...
Страница 192: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 26 August 2001 12 26 Toner TX Circuit Diagram...