Maintenance & Troubleshooting
WorkCentre Pro 412
Launch Issue
7-5
August 2001
7-2-2 Test Mode
The test mode is used to test certain functions of the machine. The available tests are:
•User mode: Clean drum, Notify toner low
•tech mode: switch test, modem test, SRAM test, DRAM test, ROM test, Pattern test, Clear count, Answer On
CNG, Adjust shading, Flash upgrade.
To enter the Tech Mode:
1.
Enter the Tech mode by pressing Menu, #, 1, 9, 3, 4. The letter “T” will appear in the top right of the dis-
play.
2.
In Tech mode, press Menu, ‘Maintenance [System]’ is displayed on the LCD.
3.
Press the Select key
4.
Scroll to the options by pressing Up and Down navigation key repeatedly until the correct selection is
found.
5.
Press the Select key to initiate the tech mode.
6.
Perform step 1 to return to user mode.
• Cleaning DRUM
This procedure removes excess toner on the OPC drum.
1. Make sure that paper is loaded in the automatic feeder or document glass (platen).
2.
Press Menu, -> Up or Down key -> Maintenance -> Select -> Up or Down key ->Clean Drum
3.
Press ‘Select’.The machine automatically feeds a sheet of paper, and prints out. The excess toner on the
OPC drum surface is fused to the paper.
• Notify Toner Low
With this feature enabled, when the toner becomes low, the toner low information will be sent to the specified
contact point, for example, the service company. After you access this menu, select on, and when the LCD
prompts, enter the name and the number of the contact point, the customer’s FAX number, the model name,
and the serial number.
• Switch Test
This test checks the operation of the LCD display and the LED indicators that interface the switches on the
operation panel.
• Modem Test
This test causes the machine to generate a particular frequency to verify the operation of the modem and it’s
control circuits.
Содержание WorkCentre Pro 412
Страница 18: ...Introduction WorkCentre Pro 412 August 2001 1 14 Launch Issue This page intentionally blank...
Страница 22: ...Precautions WorkCentre Pro 412 Launch Issue 3 2 August 2001 This page intentionally blank...
Страница 82: ...Disassembly and Reassembly WorkCentre Pro 412 Launch Issue 6 18 August 2001 This page intentionally blank...
Страница 99: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 17 August 2001 No Image...
Страница 100: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 18 August 2001...
Страница 101: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 19 August 2001 All Black...
Страница 102: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 20 August 2001 Vertical White Line Band...
Страница 103: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 21 August 2001 Dark Image...
Страница 104: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 22 August 2001 Background...
Страница 105: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 23 August 2001 Ghost...
Страница 106: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 24 August 2001 Black Dot...
Страница 107: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 25 August 2001 Horizontal Band...
Страница 108: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 26 August 2001 Irregular Density...
Страница 109: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 27 August 2001 White Spot...
Страница 111: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 29 August 2001 Poor Fusing...
Страница 114: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 32 August 2001 No Power No LCD or LEDs...
Страница 115: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 33 August 2001 Fuser Error...
Страница 116: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 34 August 2001 Paper Jam Mis feeding...
Страница 117: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 35 August 2001 Paper Jam Jam 1...
Страница 118: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 36 August 2001 Engine Error...
Страница 122: ...Exploded View Parts List WorkCentre Pro 412 Launch Issue 8 4 August 2001 8 2 Platen Ass y Exploded View Parts List...
Страница 127: ...Exploded View Parts List WorkCentre Pro 412 Launch Issue 8 9 August 2001 This page intentionally blank...
Страница 131: ...Exploded View Parts List WorkCentre Pro 412 Launch Issue 8 13 August 2001 This page intentionally blank...
Страница 150: ...Exploded View Parts List WorkCentre Pro 412 Launch Issue 8 32 August 2001 This page intentionally blank...
Страница 163: ...Block Diagram WorkCentre Pro 412 Launch Issue 10 1 August 2001 10 Block Diagram...
Страница 164: ...Block Daigram WorkCentre Pro 412 Launch Issue 10 2 August 2001 This page intentionally blank...
Страница 165: ...Connection Diagram WorkCentre Pro 412 Launch Issue 11 1 August 2001 11 Connection Diagram...
Страница 166: ...Connection Diagram WorkCentre Pro 412 Launch Issue 11 2 August 2001 This page intentionally blank...
Страница 168: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 2 August 2001 12 2 Main Circuit Diagram 2 of 14...
Страница 169: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 3 August 2001 12 3 Main Circuit Diagram 3 of 14...
Страница 170: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 4 August 2001 12 4 Main Circuit Diagram 4 of 14...
Страница 171: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 5 August 2001 12 5 Main Circuit Diagram 5 of 14...
Страница 172: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 6 August 2001 12 6 Main Circuit Diagram 6 of 14...
Страница 173: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 7 August 2001 12 7 Main Circuit Diagram 7 of 14...
Страница 174: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 8 August 2001 12 8 Main Circuit Diagram 8 of 14...
Страница 175: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 9 August 2001 12 9 Main Circuit diagram 9 of 14...
Страница 176: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 10 August 2001 12 10 Main Circuit Diagram 10 of 14...
Страница 177: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 11 August 2001 12 11 Main Circuit Diagram 11 of 14...
Страница 178: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 12 August 2001 12 12 Main Circuit Diagram 12 of 14...
Страница 179: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 13 August 2001 12 13 Main Circuit Diagram 13 of 14...
Страница 180: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 14 August 2001 12 14 Main Circuit Diagram 14 of 14...
Страница 181: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 15 August 2001 12 15 LIU Circuit Diagram...
Страница 182: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 16 August 2001 12 16 OPE Circuit Diagram...
Страница 183: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 17 August 2001 12 17 HVPS Circuit Diagram 1 of 2...
Страница 184: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 18 August 2001 12 18 HVPS Circuit Diagram 2 of 2...
Страница 185: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 19 August 2001 12 19 SMPS 110 Circuit Diagram...
Страница 186: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 20 August 2001 12 20 SMPS 220 Circuit Diagram...
Страница 187: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 21 August 2001 12 21 ADF Circuit Diagram...
Страница 188: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 22 August 2001 12 22 Flat Circuit Diagram...
Страница 189: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 23 August 2001 12 23 PTL Circuit Diagram...
Страница 190: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 24 August 2001 12 24 Sensor Circuit Diagram...
Страница 191: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 25 August 2001 12 25 Toner RX Circuit Diagram...
Страница 192: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 26 August 2001 12 26 Toner TX Circuit Diagram...