Introduction
WorkCentre Pro 412
August 2001
1-8
Launch Issue
Operator Accessible Areas
This product has been designed to restrict operator access to safe areas only. Operator access to hazardous
areas is restricted with covers or guards, which require a tool to remove. Ensure that these covers or guards
are correctly replaced after every service or maintenance task.
Maintenance/Service
Do not to carry out any maintenance or service on the product, which is not described this service documenta-
tion.
Cleaning
Before cleaning this product, unplug the product from the power outlet. Always use materials specifically des-
ignated for this product, the use of other materials may result in poor performance and may create a hazard-
ous situation. Do not use aerosol cleaners, they may become flammable under certain circumstances.
AVERTISSEMENT
Cette mention indique des informations relatives à différentes situations de maintenance.
Sécurité générale - Avertissement
Mettre la machine hors tension et débrancher le cordon d'alimentation de la prise murale lors d'interventions
qui ne nécessitent pas que l'alimentation soit maintenue. Un contact avec une zone sous tension peut mettre
en danger la sécurité des personnes.
Alimentation
Ce produit doit être utilisé avec l'alimentation indiqué sur la plaque de la machine.
Ce produit doit être connecté à un circuit avec mise à la terre.
Sécurité
Pendant toute cette procédure d'intervention dans des circuits électriques ou des entraînements mécaniques,
débranchez la machine. Le système de déconnexion est le cordon d'alimentation. Retirer le connecteur de la
prise murale.
Aération
Cet équipement ne doit pas être encastré, sans une ventilation appropriée.
Zones accessibles aux utilisateurs
Ce produit a été conçu de façon à ce que les zones accessibles par les utilisateurs soient sans danger. Les
zones qui peuvent être dangereuses sont protégées par des panneaux ou des sécurités qui nécessitent l'utili-
sation d'un outil pour être retirer. Veiller à ce que ces panneaux et sécurités sont correctement remis en place
après toute intervention technique ou de maintenance.
Maintenance
N'effectuez aucune procédure de maintenance non décrite dans la documentation.
Nettoyage
Avant toute procédure de nettoyage, débranchez l'équipement de la prise murale. Utilisez toujours les produits
d'entretien conçus spécifiquement pour l'appareil. L'utilisation d'autres produits risque de nuire au bon fonc-
tionnement de l'appareil et peut s'avérer dangereuse. N'utilisez jamais d'aérosols, ils peuvent s'enflammer
sous certaines circonstances.
AVVERTENZA
Le seguenti avvertenze sono applicabili a svariate situationi di manutenzione o di assistenza.
Содержание WorkCentre Pro 412
Страница 18: ...Introduction WorkCentre Pro 412 August 2001 1 14 Launch Issue This page intentionally blank...
Страница 22: ...Precautions WorkCentre Pro 412 Launch Issue 3 2 August 2001 This page intentionally blank...
Страница 82: ...Disassembly and Reassembly WorkCentre Pro 412 Launch Issue 6 18 August 2001 This page intentionally blank...
Страница 99: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 17 August 2001 No Image...
Страница 100: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 18 August 2001...
Страница 101: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 19 August 2001 All Black...
Страница 102: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 20 August 2001 Vertical White Line Band...
Страница 103: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 21 August 2001 Dark Image...
Страница 104: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 22 August 2001 Background...
Страница 105: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 23 August 2001 Ghost...
Страница 106: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 24 August 2001 Black Dot...
Страница 107: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 25 August 2001 Horizontal Band...
Страница 108: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 26 August 2001 Irregular Density...
Страница 109: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 27 August 2001 White Spot...
Страница 111: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 29 August 2001 Poor Fusing...
Страница 114: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 32 August 2001 No Power No LCD or LEDs...
Страница 115: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 33 August 2001 Fuser Error...
Страница 116: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 34 August 2001 Paper Jam Mis feeding...
Страница 117: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 35 August 2001 Paper Jam Jam 1...
Страница 118: ...Maintenance Troubleshooting WorkCentre Pro 412 Launch Issue 7 36 August 2001 Engine Error...
Страница 122: ...Exploded View Parts List WorkCentre Pro 412 Launch Issue 8 4 August 2001 8 2 Platen Ass y Exploded View Parts List...
Страница 127: ...Exploded View Parts List WorkCentre Pro 412 Launch Issue 8 9 August 2001 This page intentionally blank...
Страница 131: ...Exploded View Parts List WorkCentre Pro 412 Launch Issue 8 13 August 2001 This page intentionally blank...
Страница 150: ...Exploded View Parts List WorkCentre Pro 412 Launch Issue 8 32 August 2001 This page intentionally blank...
Страница 163: ...Block Diagram WorkCentre Pro 412 Launch Issue 10 1 August 2001 10 Block Diagram...
Страница 164: ...Block Daigram WorkCentre Pro 412 Launch Issue 10 2 August 2001 This page intentionally blank...
Страница 165: ...Connection Diagram WorkCentre Pro 412 Launch Issue 11 1 August 2001 11 Connection Diagram...
Страница 166: ...Connection Diagram WorkCentre Pro 412 Launch Issue 11 2 August 2001 This page intentionally blank...
Страница 168: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 2 August 2001 12 2 Main Circuit Diagram 2 of 14...
Страница 169: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 3 August 2001 12 3 Main Circuit Diagram 3 of 14...
Страница 170: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 4 August 2001 12 4 Main Circuit Diagram 4 of 14...
Страница 171: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 5 August 2001 12 5 Main Circuit Diagram 5 of 14...
Страница 172: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 6 August 2001 12 6 Main Circuit Diagram 6 of 14...
Страница 173: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 7 August 2001 12 7 Main Circuit Diagram 7 of 14...
Страница 174: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 8 August 2001 12 8 Main Circuit Diagram 8 of 14...
Страница 175: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 9 August 2001 12 9 Main Circuit diagram 9 of 14...
Страница 176: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 10 August 2001 12 10 Main Circuit Diagram 10 of 14...
Страница 177: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 11 August 2001 12 11 Main Circuit Diagram 11 of 14...
Страница 178: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 12 August 2001 12 12 Main Circuit Diagram 12 of 14...
Страница 179: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 13 August 2001 12 13 Main Circuit Diagram 13 of 14...
Страница 180: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 14 August 2001 12 14 Main Circuit Diagram 14 of 14...
Страница 181: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 15 August 2001 12 15 LIU Circuit Diagram...
Страница 182: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 16 August 2001 12 16 OPE Circuit Diagram...
Страница 183: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 17 August 2001 12 17 HVPS Circuit Diagram 1 of 2...
Страница 184: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 18 August 2001 12 18 HVPS Circuit Diagram 2 of 2...
Страница 185: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 19 August 2001 12 19 SMPS 110 Circuit Diagram...
Страница 186: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 20 August 2001 12 20 SMPS 220 Circuit Diagram...
Страница 187: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 21 August 2001 12 21 ADF Circuit Diagram...
Страница 188: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 22 August 2001 12 22 Flat Circuit Diagram...
Страница 189: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 23 August 2001 12 23 PTL Circuit Diagram...
Страница 190: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 24 August 2001 12 24 Sensor Circuit Diagram...
Страница 191: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 25 August 2001 12 25 Toner RX Circuit Diagram...
Страница 192: ...Schematic Diagrams WorkCentre Pro 412 Launch Issue 12 26 August 2001 12 26 Toner TX Circuit Diagram...