2-20
Installation
Date en cours : 29 March 2005
C:\Documents and Settings\G092899\Bureau\MFF LU 252032677A WorkCentre222-228_Australie\02_Installation GB.fm
T
ELEPHONE
AND
LAN
CONNECTION
Plug the end of the telephone line (F) into the terminal socket (D) and the other end into the wall
telephone socket.
LAN connection (depending on model). Plug end of the LAN cord (as provided by your network
administrator) into the socket (C) of your terminal and the other end into your local network port
dedicated to your terminal.
P
OWER
LINE
CONNECTION
AND
SWITCH
ON
Caution -
Refer to
Safety notes
in
Before Using the Machine
.
Plug the end of the mains power cord (G) into the socket (E) of the terminal and the other end in
the wall outlet.
Set the On/Off switch to position "
I
" (
On
).
After a few seconds, when the printer has warmed up, the date and time will appear. To adjust the
language and time of your terminal, refer to paragraph
Setting your machine
, page 4-1.
Содержание WorkCentre 222
Страница 1: ...User Guide WorkCentre 222 228...
Страница 8: ...6 Contents...
Страница 20: ...1 12...
Страница 34: ...2 14 Installation Adjust to the size of the paper or film using the paper size guide 1 or 2 1 2...
Страница 50: ...3 10 Getting started...
Страница 74: ...4 24 Setting your machine...
Страница 108: ...6 26 Operation...
Страница 133: ...Maintenance 7 25 Open the scanner cover Remove the jammed paper A without tearing it Then close the scanner cover A...