January 2016
6-21
WorkCentre 4150/4250/4260WorkCentre 4150/4250/4260WorkCentre Work-
GP 4
General Procedures and Information
4265 System Administration Tools
Perform the following:
1.
Press the Log In/Out key.
2.
Enter the User Name (default is admin).
3.
Enter the customers password (default is 1111). Touch the Done button on the UI screen.
4.
Select the Machine Status button on the UI, and select the Tools tab.
NOTE: The Machine Information, Faults and Service Information tabs are accessible
without entering System Administration Tools. Go to
GP 3
Machine Status.
Table 16 4265 System Administration Tools
1st Level
2nd Level
3rd Level
4th Level
5th Level
6th Level
Device Settings
General
Power Saver Timer
Ready Mode (low power) or
Sleep mode (very low power)
Time Zone, Date, Time
Select the appropriate time
zone, date and time.
Language/Keyboard Selection Display Language
Keyboard Layout
Altitude Adjustment
Off/On
If altitude is greater than 8000 feet, recom-
mend option be turned on.
Audio Tones
Tone Type, Volume
Fault, Conflict, Selection
Special Features Option
Number, Enabled, Disabled
Tests and Resets
User Interface Test
UI Touch Screen Test
Display Pixel Test
LED Indicator Test
UI Panel Button Test
Video Memory Test
Application Checksum Informa-
tion
Print Test Pattern
S600 Pattern (A4)
S600 Pattern (8.5 x 11 inches)
Grey Dusting with Four Line
Pattern
Grey Dusting Pattern
Ghosting Pattern
Dark Dusting
Skew Test
Character Test Pattern (2
Prints)
Timers
System Timeout
Minutes, Seconds, Warning
Screen
Enabled/Disabled
Delete Held Job After
Enabled/Disabled
Supplies
Feed Rollers Counter Reset
Tray 1, Tray 2, Tray 3 Remain-
ing Pages.
Fuser Counter Reset
Image Count, Reset
Bias Transfer Roller Reset
Image Count, Reset
Содержание 4150 - WorkCentre B/W Laser
Страница 1: ...January 2016 Xerox WorkCentre 4150 4250 4260 4265 Family Service Manual Updated 1 25 16 DAW...
Страница 3: ...0 0 00 2 No Product Name Assigned Preliminary Working Document Section Name...
Страница 5: ...January 2016 ii WorkCentre WorkCentre 4150 4250 42604150 4250 4260WorkCentre 4150 Introduction...
Страница 63: ...January 2016 1 2 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 Service Call Procedures...
Страница 81: ...January 2016 2 8 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 01A Status Indicator RAPs...
Страница 101: ...January 2016 2 28 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 04 910 Status Indicator RAPs...
Страница 115: ...January 2016 2 42 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 06 100 200 Status Indicator RAPs...
Страница 161: ...January 2016 2 88 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 14 100 Status Indicator RAPs...
Страница 165: ...January 2016 2 92 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 16 100 Status Indicator RAPs...
Страница 169: ...January 2016 2 96 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 17 900 17 910 Status Indicator RAPs...
Страница 179: ...January 2016 3 2 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 Image Quality...
Страница 233: ...January 2016 4 32 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 REP 4 3 Repairs and Adjustments...
Страница 303: ...January 2016 4 102 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 REP 5 33 Repairs and Adjustments...
Страница 327: ...January 2016 4 126 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 REP 7 8 Repairs and Adjustments...
Страница 347: ...January 2016 4 146 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 REP 9 6 Repairs and Adjustments...
Страница 399: ...January 2016 4 198 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 ADJ 1 1 Repairs and Adjustments...
Страница 413: ...January 2016 4 212 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 ADJ 14 4 Repairs and Adjustments...
Страница 415: ...January 2016 WorkCentre 4150 4250 4260WorkCentre 4150 4250 4260 4265WorkCentre Parts List...
Страница 482: ...January 2016 WorkCentre 4150 4250 4260WorkCentre 4150 4250 4260 4265WorkCentre PL 31 10 Parts List...
Страница 483: ...January 2016 WorkCentre 4150 4250 4260WorkCentre 4150 4250 4260 4265WorkCentre PL 31 10 Parts List...
Страница 484: ...January 2016 WorkCentre 4150 4250 4260WorkCentre 4150 4250 4260 4265WorkCentre PL 31 10 Parts List...
Страница 485: ...January 2016 WorkCentre 4150 4250 4260WorkCentre 4150 4250 4260 4265WorkCentre PL 31 10 Parts List...
Страница 487: ...January 2016 6 2 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 General Procedures and Information...
Страница 537: ...January 2016 6 52 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 GP 21 General Procedures and Information...
Страница 563: ...January 2016 7 2 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 Wiring Data...
Страница 627: ...January 2016 8 2 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 Accessories...