January 2016
2-29
WorkCentre 4150/4250/4260WorkCentre WorkCentre 4150/4250/42604150/
05-100
Status Indicator RAPs
05-100 DADF Jam 1 RAP
05-100 The lead edge or trail edge of the document failed to actuate or deactuate the scan
sensor within the correct time.
Procedure
WARNING
Switch off the electricity to the machine. Disconnect the power cord from the customer
supply while performing tasks that do not need electricity. Electricity can cause death or
injury. Moving parts can cause injury.
Go to the relevant procedure:
•
4150 Checkout
•
4250/4260 Checkout
4150 Checkout
Refer to
Wiring Diagram 11
. Perform the following:
1.
Open the DADF top cover assembly,
PL 5.15 Item 11
. Remove all jammed paper.
2.
Check the document path for damage or obstructions.
3.
Check that the following components are clean and rotate freely.
•
Registration roll,
PL 5.15 Item 21
.
•
Registration roll idlers,
PL 5.15 Item 28
.
4.
Remove the DADF left guide,
PL 5.20 Item 9
.
5.
Check that the scan sensor actuator,
PL 5.25 Item 28
moves freely and is not damaged.
6.
Enter
dC330
code 05-140. Check the scan sensor (Q05-140).
NOTE: The scan sensor is mounted on the DADF PWB,
PL 5.20 Item 6
.
7.
Remove the DADF rear cover,
PL 5.10 Item 4
. Enter
dC330
code 05-200. Check that the
DADF scan motor,
PL 5.25 Item 12
runs and drives the scan roll,
PL 5.25 Item 23
.
8.
Close the DADF top cover assembly. While the DADF scan motor runs, stack the code
05-310 to energize the registration clutch (CL05-310). Check that the registration roll,
PL
5.15 Item 21
rotates.
9.
Check the wiring between the DADF scan motor and CN4 on the
DADF PWB
.
10. Check the wiring between the registration clutch,
PL 5.25 Item 19
and CN6 on the
DADF
PWB
. If necessary, install a new registration clutch,
PL 5.25 Item 19
.
11.
If necessary, install new components:
•
DADF PWB,
PL 5.20 Item 6
.
•
DADF scan motor,
PL 5.25 Item 12
.
•
DADF scan motor assembly,
PL 5.25 Item 10
.
•
Document transport assembly,
PL 5.10 Item 2
.
4250/4260 Checkout
Refer to
Wiring Diagram 29
. Perform the following:
1.
Open the DADF top cover assembly,
PL 5.30 Item 2
. Remove all jammed paper.
2.
Check the document path for damage or obstructions.
3.
Check that the following components are clean and rotate freely.
•
CVT roll,
PL 5.50 Item 19
.
•
CVT roll upper idler,
PL 5.40 Item 15
.
•
CVT roll lower idler,
PL 5.35 Item 8
.
4.
Remove the DADF lower guide assembly,
PL 5.50 Item 1
.
5.
Check that the scan sensor actuator,
PL 5.55 Item 4
moves freely and is not damaged.
6.
Enter
dC330
code 05-140. Check the scan sensor (Q05-140),
PL 5.55 Item 1
.
7.
Check the wiring between the scan sensor and CN10 on the
DADF PWB
. If necessary,
install a new scan sensor,
PL 5.55 Item 1
.
8.
Remove the DADF rear cover,
PL 5.30 Item 13
. Enter
dC330
code 05-200. Check that the
DADF scan motor,
PL 5.30 Item 6
runs and drives the CVT roll,
PL 5.50 Item 19
.
9.
While the DADF scan motor runs, stack the code 05-310 to energize the registration
clutch (CL05-310). Check that the CVT roll does not rotate.
10. Check the wiring between the DADF scan motor and CN6 on the
DADF PWB
.
11.
Check the wiring between the registration clutch and CN6 on the
DADF PWB
. If neces-
sary, install a new registration clutch,
PL 5.30 Item 9
.
12. If necessary, install new components:
•
DADF scan motor assembly,
PL 5.30 Item 6
.
•
Document transport assembly,
PL 5.30 Item 26
.
•
DADF PWB,
PL 5.30 Item 24
.
Содержание 4150 - WorkCentre B/W Laser
Страница 1: ...January 2016 Xerox WorkCentre 4150 4250 4260 4265 Family Service Manual Updated 1 25 16 DAW...
Страница 3: ...0 0 00 2 No Product Name Assigned Preliminary Working Document Section Name...
Страница 5: ...January 2016 ii WorkCentre WorkCentre 4150 4250 42604150 4250 4260WorkCentre 4150 Introduction...
Страница 63: ...January 2016 1 2 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 Service Call Procedures...
Страница 81: ...January 2016 2 8 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 01A Status Indicator RAPs...
Страница 101: ...January 2016 2 28 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 04 910 Status Indicator RAPs...
Страница 115: ...January 2016 2 42 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 06 100 200 Status Indicator RAPs...
Страница 161: ...January 2016 2 88 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 14 100 Status Indicator RAPs...
Страница 165: ...January 2016 2 92 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 16 100 Status Indicator RAPs...
Страница 169: ...January 2016 2 96 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 17 900 17 910 Status Indicator RAPs...
Страница 179: ...January 2016 3 2 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 Image Quality...
Страница 233: ...January 2016 4 32 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 REP 4 3 Repairs and Adjustments...
Страница 303: ...January 2016 4 102 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 REP 5 33 Repairs and Adjustments...
Страница 327: ...January 2016 4 126 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 REP 7 8 Repairs and Adjustments...
Страница 347: ...January 2016 4 146 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 REP 9 6 Repairs and Adjustments...
Страница 399: ...January 2016 4 198 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 ADJ 1 1 Repairs and Adjustments...
Страница 413: ...January 2016 4 212 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 42604150 ADJ 14 4 Repairs and Adjustments...
Страница 415: ...January 2016 WorkCentre 4150 4250 4260WorkCentre 4150 4250 4260 4265WorkCentre Parts List...
Страница 482: ...January 2016 WorkCentre 4150 4250 4260WorkCentre 4150 4250 4260 4265WorkCentre PL 31 10 Parts List...
Страница 483: ...January 2016 WorkCentre 4150 4250 4260WorkCentre 4150 4250 4260 4265WorkCentre PL 31 10 Parts List...
Страница 484: ...January 2016 WorkCentre 4150 4250 4260WorkCentre 4150 4250 4260 4265WorkCentre PL 31 10 Parts List...
Страница 485: ...January 2016 WorkCentre 4150 4250 4260WorkCentre 4150 4250 4260 4265WorkCentre PL 31 10 Parts List...
Страница 487: ...January 2016 6 2 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 General Procedures and Information...
Страница 537: ...January 2016 6 52 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 GP 21 General Procedures and Information...
Страница 563: ...January 2016 7 2 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 Wiring Data...
Страница 627: ...January 2016 8 2 WorkCentre WorkCentre 4150 4250 4260WorkCentre 4150 4250 Accessories...