
Basic Functional Test - Single Inverter
975-0384-01-02
2–31
This manual for use by qualified personnel only
Confirming Battery Charger Operation
To confirm battery charger operation:
1.
Apply AC from grid or generator, and then confirm voltage.
2.
Check LEDs (AC1 or AC2) on the front panel. One of them must be on for the
unit to charge. Check the amp “A” LED. If the “A” LED is on, the unit is
charging and the battery current is displayed on the information panel.
This completes the functional test. If all tests pass, the inverter is ready for use. If
any of the inverter’s internal set points need to be adjusted, consult the
configuration chapter of the operation guide.
Figure 2-19
Checking AC Voltage
AC
LOAD
GRID
(AC1)
GEN
(AC2)
AC
OUT
AC IN
AC IN
L
N
L
N
L
N
Figure 2-20
Checking Charging Operation
Important:
Unless the inverter/charger settings have been changed, the inverter
will charge as if it has a large (> 440 Ah) flooded battery bank (factory default
setting). Therefore, ALL systems may need to have the battery charging set
points configured to avoid damage to the batteries.
Amp (“A”) LED
Содержание XW4024 230 50
Страница 2: ...YOUR SCHNEIDER ELECTRIC DISTRIBUTOR SOLIGENT 800 967 6917 www soligent net...
Страница 3: ...Xantrex XW Hybrid Inverter Charger Installation Guide www schneider electric com...
Страница 8: ...vi...
Страница 18: ...1 8...
Страница 56: ...2 38...
Страница 66: ...IX 2...
Страница 67: ......