Installation
Functional Tests
Release 2.2
31
Current Mode
Operation
To check current mode operation, proceed as follows:
1. Rotate the VOLTAGE and CURRENT controls fully counterclockwise.
2. Rotate the VOLTAGE control 1/2 turn clockwise.
3. Connect a high current DC ammeter
1
across the rear output terminals, observing
correct polarity. Select leads of sufficient current carrying capacity and an
ammeter range compatible with the unit's rated current output. The ammeter
should have an accuracy of better than 0.5%.
4. Set the POWER switch to ON.
5. Rotate the CURRENT control slowly clockwise. The control range should be
from zero to the maximum rated output. Compare the test meter reading with the
reading on the front panel ammeter. Check that the red current mode indicator
led is ON.
6. Set the POWER switch to OFF.
1. Either a direct reading meter or calibrated meter and shunt combination.
Содержание XKW 150-7
Страница 2: ......
Страница 3: ...Operating Manual for XKW 1000 Watt Series Programmable DC Power Supply ...
Страница 15: ...Features and Specifications Front Panel Controls Release 2 2 13 Figure 1 1 Power Supply Front Panel ...
Страница 24: ...Features and Specifications Specifications 22 Operating Manual for XKW 1kW Series Power Supply ...
Страница 38: ...Installation Local and Remote Sensing 36 Operating Manual for XKW 1kW Series Power Supply ...
Страница 56: ...Operation Using Over Temperature Protection OTP 54 Operating Manual for XKW 1kW Series Power Supply ...
Страница 59: ......