Operating Manual for XKW 1kW Series Power Supply
Functional Tests
Before connecting the unit to an AC outlet, make sure that the power switch is in the
OFF position and that the voltage and current controls are turned fully counter
clockwise. Check that the J3 mating connector on the rear of the unit is in place with
jumpers connected for local operation as shown below. (This is the default
configuration as shipped from the factory). Connect the unit to a 230Vac grounded
outlet (115Vac outlet if previously configured for 115Vac operation as per
instructions in
“AC Input Voltage Selection” on page 28
) and switch the unit on.
After a short power on delay the front panel meters should light up with both displays
reading zero.
Figure 2.2
Connector J3 Configuration for Local Operation
Voltage Mode
Operation
To check voltage mode operation, proceed as follows:
1. Connect a DVM, rated better than 0.5% accuracy, to the rear output terminals,
observing correct polarity.
2. Rotate the CURRENT control 1/2 turn clockwise. Slowly rotate the VOLTAGE
control clockwise and observe both the internal and external meters. Minimum
control range should be from zero to the maximum rated output. Compare the
test meter reading with the front panel voltmeter reading. Check that the green
voltage mode indicator led is ON.
3. Set the POWER switch to OFF.
Содержание XKW 150-7
Страница 2: ......
Страница 3: ...Operating Manual for XKW 1000 Watt Series Programmable DC Power Supply ...
Страница 15: ...Features and Specifications Front Panel Controls Release 2 2 13 Figure 1 1 Power Supply Front Panel ...
Страница 24: ...Features and Specifications Specifications 22 Operating Manual for XKW 1kW Series Power Supply ...
Страница 38: ...Installation Local and Remote Sensing 36 Operating Manual for XKW 1kW Series Power Supply ...
Страница 56: ...Operation Using Over Temperature Protection OTP 54 Operating Manual for XKW 1kW Series Power Supply ...
Страница 59: ......