Installation
3–4
153379
This manual for use by qualified installers only
Moving with a Sling
To move the GT100 using a sling:
1. Place the lifting slings through the box tubing on the enclosure base at the
points specified in Figure 3-3 on page 3–4.
2. Lift the GT100 from above.
3. Remove the shipping pallet from beneath the unit.
4. Once the shipping pallet is removed from the unit, use the same lifting
locations to lift the unit into the place where it may be permanently located.
Figure 3-2
Forklift Lifting Locations - Underneath Unit
66 cm fork span
Figure 3-3
Moving with a Sling
2
1
Содержание GT100 Series
Страница 1: ...Xantrex GT100 Grid Tied Photovoltaic Inverter Planning and Installation Manual ...
Страница 2: ......
Страница 8: ...vi ...
Страница 16: ...xiv ...
Страница 20: ...xviii ...
Страница 22: ...xx ...
Страница 24: ...xxii ...
Страница 66: ...3 16 ...
Страница 70: ...4 4 ...
Страница 77: ......