Safety
153379
xiii
This manual for use by qualified installers only
De-Energize/Isolation Procedure
The following procedure should be followed to de-energize the GT100 for
maintenance.
To isolate the GT100:
1. Turn the main
ON
/
OFF
switch (S3) to the
OFF
position.
2. Open the utility connection circuit breaker.
3. Open the AC Disconnect (CB1).
4. Open the DC Disconnect Switch (S1).
5. Install lockout devices on the utility connection circuit breaker, AC and DC
disconnect switch.
Interconnection Standards Compliance
The GT100 complies with FCC Part 15 Class A requirements.
The GT100 is designed to meet NEC Article 690 and UL1741-2005
Static
Inverters And Charge Controllers For Use In Photovoltaic Power Systems
, which
includes testing for IEEE 1547.1-2005, IEEE 929-2000 and IEEE 519-2000.
Intended Use
The GT100 may only be used in connection with PV modules. It is not suitable for
any other application areas.
WARNING
The terminals of the DC input may be energized if the PV arrays are energized. In
addition, allow five minutes for all capacitors within the main Enclosure to discharge after
disconnecting the GT100 from AC and DC sources.
Содержание GT100 Series
Страница 1: ...Xantrex GT100 Grid Tied Photovoltaic Inverter Planning and Installation Manual ...
Страница 2: ......
Страница 8: ...vi ...
Страница 16: ...xiv ...
Страница 20: ...xviii ...
Страница 22: ...xx ...
Страница 24: ...xxii ...
Страница 66: ...3 16 ...
Страница 70: ...4 4 ...
Страница 77: ......