56
3. Check burner flame. (Should see light blue flame
at full input rate).
Weekly
For low-pressure boilers, test low-water cut-off device.
(With boiler in pre-purge, depress the low water cut-off
test button. Appliance should shut-off and ignition fault
light should come on. Depress reset button on front of
heater control panel to reset).
Monthly
1. Check flue, vent, stack, or dampers.
2. Test intake air pressure. (See Table X.) Replace
the filter when the intake air pressure increases
by –0.5 in. WC from the reading recorded on the
start-up checklist.
3. Test high and low gas pressure interlocks (if
equipped). (See “Safety Inspection”.)
Semi-Annually
1. Recalibrate all indicating and recording gauges.
2. Check flame failure detection system components.
3. Check firing rate control by checking the manifold
pressure. (See “Manifold Check”.)
4. Check piping and wiring of all interlocks and shut-
off valves.
Annually
1. Test flame failure detection system.
2. Test high limit and operating temperature. (See
“Post Start-Up Check”.)
3. Check flame sensor.
4. Conduct a combustion test at high and low fire.
Carbon dioxide should be 8.5 to 9.0% at full fire for
natural gas, and between 9.5 to 10.0% for
propane gas. Carbon monoxide should be <150
ppm.
5. Check valve coil for 60 cycle hum or buzz. Check
for leaks at all valve fittings using a soapy water
solution (while unit is operating). Test other oper-
ating parts of all safety shut-off and control valves
and increase or decrease settings (depending on
the type of control) until the safety circuit opens.
Reset to original setting after each device is test-
ed.
6. Perform leakage test on gas valves, if required by
local codes.
7. Inspect and clean burner using shop air.
8. Clean the combustion chamber coil, using the pro-
cedure on the following page.
As Required
1. Recondition or replace low water cut-off device (if
equipped).
2. Check drip leg and gas strainers.
3. Check flame failure detection system. (See “Post
Start-Up Check”.) Verify high and low fire flame
signal, compare to start-up data.
4. Check igniter. Clean and verify spark gap (see
Fig. 41).
5. Check fan speed and manifold pressure. (See
“Blower Check” and “Manifold Check”.)
6. Test safety/safety relief valves in accordance with
ASME Heater and Pressure Vessel Code Section
IV.
Содержание 300A-850A
Страница 46: ...46 WIRING DIAGRAM...
Страница 62: ...62...
Страница 63: ...63...
Страница 64: ...64 www raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468 Litho in U S A...