Turb 430 IR/T
Commissioning
17
ba75507e05
07/2016
3.4
Initial commissioning
Perform the following activities:
For
– accumulator operation: insert the accumulator pack (see
section 5.1.2)
– line power operation and charging the accumulator pack: connect
the power pack (see section 3.2)
– operation with LabStation: connect the LabStation and place the
Turb 430 IR/T in the LabStation (see section 3.3)
Switch on the meter (see section 4.1)
Set the language as necessary (see section 4.3.3)
Set the date and time as necessary (see section 4.3.4)
Note
When you set the language, date and time according to the mentioned
sections of this operating manual you will quickly become familiar with
the simple operation of the Turb 430 IR/T.
Содержание Turb 430 IR/T
Страница 1: ...OPERATING MANUAL ba75507e05 07 2016 Turb 430 IR T HANDHELD TURBIDIMETER...
Страница 2: ...ba75507e05 07 2016 Turb 430 IR T Copyright 2016 Xylem Analytics Germany GmbH Printed in Germany...
Страница 12: ...Safety Turb 430 IR T 12 ba75507e05 07 2016...
Страница 16: ...Commissioning Turb 430 IR T 16 ba75507e05 07 2016 LabStation...
Страница 18: ...Commissioning Turb 430 IR T 18 ba75507e05 07 2016...
Страница 50: ...Operation Turb 430 IR T 50 ba75507e04 06 2009...
Страница 56: ...What to do if Turb 430 IR T 56 ba75507e05 07 2016...
Страница 60: ...Technical data Turb 430 IR T 60 ba75507e05 07 2016...
Страница 66: ...Lists Turb 430 IR T 66 ba75507e05 07 2016...
Страница 68: ...Index Turb 430 IR T 68 ba75507e05 07 2016...
Страница 71: ...Turb 430 IR T ba75507e05 07 2016 71...