Operation
Turb 430 IR/T
20
ba75507e04
06/2009
Display illumination
with battery-powered
operation
During operation with batteries or accumulator pack the meter
automatically switches off the display illumination if no key is pressed
for 30 seconds. The illumination is switched on again with the next
keystroke.
4.2
Inserting a cell
To be able to insert cells in the Turb 430 IR/T, the cell shaft has to be
prepared to take in a cell.
Inserting a 28 mm cell
1
Push the dust cover (1) upward.
The cell shaft for 28 mm cells is open.
1
2
Insert the cell so that it is positioned on the bottom of the cell
shaft.
The cell is ready to be measured.
3
Align the cell (see section 4.5.2).
Содержание Turb 430 IR/T
Страница 1: ...OPERATING MANUAL ba75507e05 07 2016 Turb 430 IR T HANDHELD TURBIDIMETER...
Страница 2: ...ba75507e05 07 2016 Turb 430 IR T Copyright 2016 Xylem Analytics Germany GmbH Printed in Germany...
Страница 12: ...Safety Turb 430 IR T 12 ba75507e05 07 2016...
Страница 16: ...Commissioning Turb 430 IR T 16 ba75507e05 07 2016 LabStation...
Страница 18: ...Commissioning Turb 430 IR T 18 ba75507e05 07 2016...
Страница 50: ...Operation Turb 430 IR T 50 ba75507e04 06 2009...
Страница 56: ...What to do if Turb 430 IR T 56 ba75507e05 07 2016...
Страница 60: ...Technical data Turb 430 IR T 60 ba75507e05 07 2016...
Страница 66: ...Lists Turb 430 IR T 66 ba75507e05 07 2016...
Страница 68: ...Index Turb 430 IR T 68 ba75507e05 07 2016...
Страница 71: ...Turb 430 IR T ba75507e05 07 2016 71...