background image

Installation

MIQ/CR3; DIQ/CR3 

12

ba64107d13

03/2018

3.6

Connections to the relay and current outputs

WARNING

No free wires are allowed to project into the housing. Oth-
erwise, there is a danger that areas safe to contact could 
come into contact with dangerous voltages. Always cut 
off any wires that are not in use as closely as possible to 
the cable gland.

WARNING

If external electrical circuits that are subject to the danger 
of physical contact are incorrectly connected to the relay 
contacts, there may be a danger of life threatening electric 
shock. Electrical circuits are regarded to be subject to the 
danger of physical contact when there are voltages higher 
than the Safety Extra Low Voltage (SELV). 
Pay attention to the following points during installation:

Electrical circuits subject to the danger of physical 
contact must only be connected by a qualified 
electrician.

Electrical circuits subject to the danger of physical 
contact must only be connected when they are voltage-
free.

The terminal strip of the MIQ/CR3; DIQ/CR3 output 
module has two segments for relay outputs with three 
relay connections each (R1-R3 and R4-R6).
If electrical circuits subject to the danger of physical 
contact are switched with a relay, no circuit that is not 
subject to this danger (e. g. the MIQ/CHV module) may 
be operated in the same output segment of the MIQ/
CR3; DIQ/CR3. For such applications use the second 
output segment of the MIQ/CR3; DIQ/CR3.

Switching voltages and switching currents on the relay 
contacts must not exceed the values specified in 
chapter 6 T

ECHNICAL

 

DATA

. Protect electrical circuits 

against currents that are too high with an electrical 
fuse.

Only single-phase consumers can be switched with the 
relays. Under no circumstances must multiphase 
consumers be switched with the aid of several relays 
(example three-phase current driven pumps). Always 
switch multiphase consumers via a protective relay.

The MIQ/CR3; DIQ/CR3 may only be opened after the 
installation if all external voltages have been 
previously switched off.

Содержание IQ SENSOR NET

Страница 1: ...OPERATING MANUAL ba64107e13 03 2018 IQ SENSOR NET MIQ CR3 DIQ CR3 IQ SENSOR NET COMBI OUTPUT MODULE Power OK...

Страница 2: ...MIQ CR3 DIQ CR3 2 ba64107d13 03 2018 Copyright 2018 Xylem Analytics Germany GmbH Printed in Germany...

Страница 3: ...nts for safe operation 8 2 2 3 Unauthorized use 8 2 3 User qualification 8 3 Installation 9 3 1 Scope of delivery 9 3 2 Basic principles of installation 9 3 2 1 Requirements of the measurement locatio...

Страница 4: ...List of contents MIQ CR3 DIQ CR3 4 ba64107e13 03 2018...

Страница 5: ...g manual has a modular structure like the IQ SENSOR NET itself It consists of a system operating manual and the operating manuals of all the components used Please file this component operating manual...

Страница 6: ...ng the combi output module has the same characteristics as all MIQ modules regarding stability leakproofness and weather resistance It also provides the same wide variety of installation options stack...

Страница 7: ...where goods might be damaged if the actions mentioned are not taken 2 1 2 Safety signs on the product Note all labels information signs and safety symbols on the product A warning symbol triangle with...

Страница 8: ...xplicitly described in this operating manual example connecting electrical lines to the terminal strip 2 2 3 Unauthorized use The product must not be put into operation if it is visibly damaged e g af...

Страница 9: ...rement location The measurement location must meet the environmental conditions specified in section 6 1 GENERAL DATA Controlled environmental conditions Work on the open instrument e g during mountin...

Страница 10: ...h the following regulations UL 2556 VW 1 for USA Canada IEC 60332 1 2 outside of USA Canada 3 4 Installation in the IQ SENSOR NET The IQ SENSOR NET provides a number of options for integrating the com...

Страница 11: ...for the installation Always fit all the ends of the wires with wire end sleeves before connecting them to the terminal strip Any wires that are not used and project into the enclosure must be cut off...

Страница 12: ...anger of physical contact must only be connected when they are voltage free The terminal strip of the MIQ CR3 DIQ CR3 output module has two segments for relay outputs with three relay connections each...

Страница 13: ...trip with the relay and current connections 1 Open the module 2 Screw the cable gland pos 1 in Fig 3 1 with the sealing ring pos 2 into the module housing 3 Loosen the coupling ring pos 3 in Fig 3 1 4...

Страница 14: ...bel located under the terminal strip 6 Tighten the coupling ring pos 3 in Fig 3 1 WARNING No free wires are allowed to project into the housing Oth erwise there is a danger that areas safe to contact...

Страница 15: ...ete links of outputs with sensors adjust outputs check the condition of the outputs Functions of current and relay outputs Relay output System monitoring Sensor monitoring Limit indicator Frequency co...

Страница 16: ...enance The combi output module does not require any special maintenance work The general maintenance of IQ SENSOR NET components is described in the IQ SENSOR NET system operating manual 5 2 Cleaning...

Страница 17: ...nsions Fig 6 1 Dimension drawing of MIQ module dimensions in mm Mechanical structure 100 148 144 0 115 0 70 0 144 0 45 0 72 0 52 2 11 0 16 5 Side view Front view Rear view Stack mounting Maximum numbe...

Страница 18: ...e 25 C 65 C 13 149 F Relative humidity Mounting installation maintenance 80 Yearly average 90 Dew formation Possible Site altitude Max 2000 m above sea level Applicable norms EN 61010 1 UL 61010 1 CAN...

Страница 19: ...Protective class II Overvoltage category II IQ SENSOR NET connections 2 Additional connectable SENSORNET terminator terminating resistor Number of relay contacts 3 Number of current outputs 3 Terminal...

Страница 20: ...Sensor monitoring Limit indicator Frequency controller Pulse width contr Cleaning Sensor controlled Manual control Alarm contact MIQ CR3 only Output Physically separated from the IQ SENSOR NET Output...

Страница 21: ...rmation about Contents and structure of the log book and Structure of the message code can be found in the LOG BOOK chapter of the IQ SENSOR NET system operating manual All message codes of the MIQ CR...

Страница 22: ...Indexes MIQ CR3 DIQ CR3 22 ba64107d13 03 2018...

Страница 23: ......

Страница 24: ...uden Fabriken und landwirtschaftlichen Betrieben zu nutzen In mehr als 150 L ndern verf gen wir ber feste langj hrige Beziehungen zu Kunden bei denen wir f r unsere leistungsstarke Mischung aus f hren...

Отзывы: