15
OPERATING INSTRUCTIONS
PRE-OPERATION CHECKLIST
——————————————————
(OWNER/OPERATOR RESPONSIBILITY)
____ Review and follow safety rules and safety signs on
pages 3 through 12.
____ Check that Grader Blade is properly and securely
attached to skid steer.
____ Lubricate all grease fitting locations.
____ Check that all hardware is properly installed.
____ Check that no one enters the area of machine oper-
ation.
____ Know your controls and how to stop skid steer
quickly in an emergency. READ THIS MANUAL
AND THE ONE PROVIDED WITH YOUR POWER
UNIT.
____ To avoid accident or injury, do not allow anyone to
operate this equipment without proper instructions.
Any person who operates this equipment must be
instructed in and be capable of the safe operation
of the skid steer, attachment and all controls.
OPERATION
——————————————————
The operator is responsible for the safe operation of this
equipment. The operator must be properly trained.
Operators should be familiar with the attachment, skid
steer and all safety practices before starting operation.
Make sure all operators have read the
Owner’s/Operator’s Manual and are familiar with the
instructions and the safety rules of operation.
All reference to left, right, front, or rear are given from
the operator’s position, facing the direction of forward
travel.
NOTE: Watch for and avoid hidden obstructions, i.e.,
buried pipes, rocks, concrete piers, or uneven slabs
of concrete, when operating, or blade damage may
occur.
NOTE: Stop skid steer and implement immediately
upon striking an obstruction. Turn off engine, remove
key, inspect, and repair any damage before resuming
operation.
TO LEVEL
——————————————————
To level an area, install the optional end plates on each
end of the grader blade moldboard.
Set the blade angle at 90° to forward travel.
The optional end plates will keep excess material from
leaving a ridge at the end of the moldboard and carry the
material to fill in any low spots.
To order optional end plates, order #81
.
TO GRADE
——————————————————
1. Activate auxiliary control in skid steer (see skid steer
manufacturer’s operation manual).
2. Raise grader blade using the left and right-side lift
switches.
3. Position loader arms on the skid steer to the frame
stops.
4. Tilt attachment plate forward raising the front tires of
the skid steer off the ground approximately 4”-5”.
5. Adjust the grader blade downward to meet desired
grade.
6. To raise blade height while grading, tilt attachment
plate forward.
7. To lower blade height while grading, tilt attachment
plate backward.
8. Angle blade to direct flow of material as desired.
Tips For Operation
For best grading:
1. Start grading at perimeter of work area with blade
angled to left or right.
2. Once end of first path is reached, spin around to next
path, keeping blade at same angle.
3. Once end of second path is reached, double back to
push excess material into next grading path. Follow
this procedure, keeping blade at same angle, until
grading is complete.
Содержание SSGB-8B
Страница 2: ......
Страница 24: ...22 SSGB 8 GRADER BLADE PARTS DRAWING...
Страница 27: ...25 66 GRADER BLADE WIRING CONNECTION INSTRUCTIONS...
Страница 28: ...26 66 GRADER BLADE ELECTRICAL SCHEMATIC...
Страница 32: ...30 BOLT TORQUE CHART...
Страница 33: ...NOTES...
Страница 34: ...NOTES...
Страница 35: ......