COMMISSIONING
6 720 648 726 (2011/07)
55
10.2.9 MEASURING THE FLUE GASES CO
2
EMISSIONS
B
Open at least 2 thermostatic radiator valves. Do not
switch on the boiler.
B
Push on the control panel to open it (
Æ
B
Switch off the heating system by pressing the mains
switch of the BC10 basic controller (
Æ
B
Remove the cover from the flue gas measuring point
[1].
B
Connect the flue gas analyser to the left-hand
measuring point.
Fig. 91 Measuring the gas supply pressure
B
Switch on the heating system by pressing the mains
switch of the BC10 basic controller (
Æ
B
Press and hold the "Chimney sweep" button
(
Æ
fig. 90, [3]) (approx. 2 seconds), until the dot in
the right-hand bottom corner of the display
(
Æ
fig. 90, [9]) appears. See also table 10, "Flue gas
test", page 42.
B
After the "Burner" LED (
Æ
fig. 90, [6]) has lit up wait
for one minute until the boiler is burning at full load.
B
Measure the carbon monoxide content at the flue gas
measuring point (
Æ
fig. 91).
The CO values in air-free condition must be less than
400 ppm or 0.04 vol. %. Values of 400 ppm or more
indicate an incorrect burner adjustment
(
Æ
section 10.2.7, page 52), a dirty gas burner or heat
exchanger or burner faults.
B
You must determine and remove the cause
(
Æ
chapter 12, page 61).
B
Press the "Chimney sweep" button (
Æ
fig. 90, [3]) to
clear the reading. See also table 10, "Flue gas test",
page 42.
B
Switch off the heating system by pressing the mains
switch of the BC10 basic controller
Æ
fig. 90, [1]).
B
Remove the flue gas analyser and fit the cover back
onto the flue gas measuring point (
Æ
B
Switch on the heating system by pressing the mains
switch of the BC10 basic controller (
Æ
fig. 90, [1]).
B
Press on the control panel to close it (
Æ
page 58).
10.2.10 CARRYING OUT A FUNCTION TEST
B
During initial start-up and annual inspection and/or
needs-oriented servicing, make sure that all control,
regulating and safety devices are in full working order
and, if applicable, check them for correct adjustment.
B
The gas and water circuits must be tested for leaks
(
Æ
sections 10.2.1 and 10.2.8).
10.2.11 MEASURING THE IONISATION CURRENT
B
Push on the control panel to open it (
Æ
fig. 68,
page 40).
B
Open at least 2 thermostatic radiator valves. Do not
switch on the boiler.
B
Switch off the heating system by pressing the mains
switch of the BC10 basic controller
Æ
fig. 90, [1]).
B
Turn the vent key through a quarter rotation to undo
the boiler door lock (
Æ
fig. 71, see detailed picture,
page 47).
B
Push the fastener down and open the boiler door
(
Æ
fig. 71, page 47).
B
Undo the plug and socket connection of the
monitoring cable.
Fig. 92 Removing the ionisation electrode plug and
socket connection
6 720 648 726-091.1TD
1
6 720 648 726-092.1TD
Содержание GB162-100
Страница 94: ...INDEX 6 720 648 726 2011 07 94 NOTES ...
Страница 95: ...INDEX 6 720 648 726 2011 07 95 NOTES ...