DISPLAY INFORMATION
6 720 648 726 (2011/07)
72
e
[-/h/}
3)
e
[2/0/0|
Operating phase:
The boiler is in manual operation mode.
Off
The room
temperature is too
high.
e
[=/h/\|
e
[2/0/1|
Operating phase:
The boiler is in DHW mode.
Off
e
[=/h/\|
e
[2/0/1|
Operating phase:
Pump run-over time via the external hot
water cylinder 130 seconds at the minimum
speed. The "Burner" LED (On/Off) is off.
Off
e
[0/a/\|
e
[2/0/2|
Operating phase:
The switch optimisation program is
activated. This program is activated if there
has been any demand more frequently than
once every 10 minutes. This means that the
boiler cannot be restarted until at least 10
minutes have elapsed since initial burner
start-up.
Off
The room
temperature is not
possibly reached.
e
[0/a/\|
e
[3/0/5|
Operating phase:
The boiler cannot start up temporarily after
a DHW request has ended.
Off
e
[0/c/\|
e
[2/8/3|
Pre-operative phase:
The boiler prepares for a burner start-up
whenever a heat demand or a DHW request
arises.
Off
e
[0/e/\|
e
[2/6/5|
Readiness for operation:
The boiler is in standby mode. There is a
current heat demand, but too much energy
has been supplied.
Off
e
[0/h/\|
e
[2/0/3|
Readiness for operation:
The boiler is in standby mode. There is no
current heat demand.
Off
e
[0/l/\|
e
[2/8/4|
Ignition phase:
The gas valve is activated.
Off
e
[0/u/\|
e
[2/7/0|
Start-up phase:
The boiler starts up after activation of the
mains power supply or completion of a
system reset. This code is displayed for a
maximum of 4 minutes.
Off
Display codes
Display code
LED on
UBA 3
Other effects
z
Main
display
code
z
Sub
display
code
z
Key to display code
Reset
requi-
red?
Table 24 Display codes
Содержание GB162-100
Страница 94: ...INDEX 6 720 648 726 2011 07 94 NOTES ...
Страница 95: ...INDEX 6 720 648 726 2011 07 95 NOTES ...