Manual 35086
ProTech-GII with Math Functions
Woodward
19
Chapter 2.
Installation
Introduction
This chapter provides instructions on how to mount and connect the ProTech-GII overspeed safety device
into a system. Hardware dimensions, ratings, and jumper configurations are given to allow a customer to
mount, wire, and configure the ProTech-GII package to a specific application.
Electrical ratings, wiring requirements, and options are provided to allow for full integration of the
ProTech-GII into a new or existing application.
Unpacking
Before opening the shipping packaging, inspect the shipping container for damage and document any
damage.
Be careful when opening and removing the shipping container. You may retain the original shipping
container for unit storage or return shipping for suggested refurbishment. (See Asset Management
Chapter for storage details.)
Be careful when unpacking the ProTech-GII system from the shipping container. The precautions called
out in the Electrostatic Discharge Awareness section should be followed during unpacking, handling,
installation and operation during maintenance.
Once removed from the shipping packaging, check the device for signs of damage such as a bent or
dented case and loose or broken parts. If damage is found, notify the shipper immediately.
Hardware Installation Procedure
1. Read and understand this manual completely before proceeding.
2. Create a site specific wiring diagram by referencing included wiring diagrams and constraints. Then
perform mechanical and electrical installation following this chapter’s instructions.
3. Visual
inspection
a. Verify that all mounting hardware is tightened and that no wires are pinched.
b. Verify that no wiring insulation is nicked or abraded.
c. Verify that all terminal blocks are installed and terminal screws are tight. Follow control wiring
instructions for all terminal blocks.
d. If used, verify that speed sensors have been correctly installed, and have the correct clearance
from the speed gear. Adjust if necessary. See manual 82510, Magnetic Pickups and Proximity
Switches for Electronic Governors.
4. Apply power to each module, one at a time, and verify that each module boots up and its front panel
screen displays turbine or equipment speed.
5. Enter the configuration mode and configure all settings to the specific application’s requirements.
6. Perform a full system checkout by verifying that all system trips, alarms, and test routines function
correctly before starting the machinery/system.
7. When ready, start the turbine/machinery, following the equipment manufacturer’s recommended
starting procedure.
Released
Содержание ProTech-GII
Страница 60: ...Manual 35086 ProTech GII with Math Functions Woodward 58 Figure 3 8 Simplex Trip Block Assembly Released ...
Страница 189: ...Manual 35086 ProTech GII with Math Functions Woodward 187 Figure A 13 Advanced Menu Released ...
Страница 193: ...Manual 35086 ProTech GII with Math Functions Woodward 191 Revision History New Manual Released ...
Страница 194: ...Manual 35086 ProTech GII with Math Functions Woodward 192 Declarations Released ...