
21
English
1/04/17 Rev:1.0.0
11 - MAINTENANCE
11.1 Programmed routine maintenance
Maintenance should be carried out according to the effective running time of the system so to
ensure effi cient performance and avoid serious mechanical damages:
BEFORE CARRYING OUT ANY MAINTENANCE
OPERATION, IT IS MANDATORY TO UNPLUG
THE POWER SUPPLY CABLE FROM THE POWER
SUPPLY INLET. PROTECTIVE MASK AND GLOVES
MUST ABSOLUTELY BE WORN
Maintenance
Executor
Every 15 days*
Filter cleaning
User
Every year
Filter replacement
Technical assistance
Every year
Air exhaust blockage
Technical assistance
Every two years
Motor carbons replacement
Technical assistance
Содержание Nova 2
Страница 1: ...2 TECHNICAL MANUAL NOVA 2 VACUUM UNIT...
Страница 2: ......
Страница 28: ...Instructions manual NOVA 2 vacuum unit 1 04 17 Rev 1 0 0 28...
Страница 29: ...29 English 1 04 17 Rev 1 0 0 APPENDIX A EXAMPLE OF INSTALLATION WITH NOVA...
Страница 33: ...1 04 17 Rev 1 0 0 33 English NOTES...
Страница 34: ...Instructions manual NOVA 2 vacuum unit 1 04 17 Rev 1 0 0 34 NOTES...
Страница 35: ......
Страница 36: ...NOVA 2 VACUUM UNIT F09200235 03 declan woodco energy com www woodco energy com...