Introduction
Machine and site preparation
EGdoc013119
1-2
1
1.2
Machine and site preparation
The sawmill is delivered and installed at customer’s premises by the Wood-Mizer Customer Service.
The major components of the WB2000EC sawmill are shown in the figure below.
FIG. 1-1
Saw Head
Blade Motor
Operator’s Stand
Debarker
Sawmill Bed
Содержание Titan WB2000-EC
Страница 1: ......
Страница 2: ......
Страница 30: ...Setup Operation Sawmill Setup 4 4 4 EGdoc013119 FIG 4 3 WB2000 hes_017_A Lifting brackets...
Страница 64: ...Maintenance Cleaning and Maintenance 5 5 3 EGdoc013119 Debarker in out drive belt cover See Figure 5 2 FIG 5 2...
Страница 65: ...Maintenance Cleaning and Maintenance EGdoc013119 5 4 5 Blade drive belt cover See Figure 5 3 FIG 5 3...