6. Transportation, installation, commissioning and shutdown
6.1 Transportation
Transport the pump unit to its destination carefully and by using suitable aids (e.g. hand-carts
or the like).
6.2 Unpacking
Lift the pump unit out of its packaging carefully and put it on a stable and plane base.
Note!
The pump unit and the components attached in accordance with
the scope of delivery may still contain residues of blue-dyed test oil.
6.3 Installation
The pump unit is ready for wall-mounting. It is to be secured by means of two M10 screws.
The mounting surface must be sufficiently stable in order to be capable of carrying the pump
unit’s weight including the filled reservoir.
Besides, it needs to be ensured that the
mounting surface is vertical and plane.
Important!
Particularly, when operating the pump unit with attached
progressive distributors, vibration-free and resilient mounting
needs to be ensured.
Drill scheme:
160
20
Additional mounting
holes,
ø11 mm
Mounting holes,
ø11 mm