Translation of the original operation manual
HERKULES PFP
19
HERKULES PFP_BAoDB_en_1402_B · rs
Unit description
Fig. 6: Rear view of the
HERKULES PFP
24
25
19
16
17
18
20
22
23
21
17
No. Designation
16 Maintenance unit
17 Ring screws for safe lifting with hoisting devices
18 Air pressure regulator for the ram
19 Air pressure regulator for the pump
20 Deicing system
21 Pressure gauge for the air inlet pressure
22 Compressed air shut-off valve
23 Compressed air connection
24 Container ventilation with ball valve
25 Grounding terminal with grounding cable
The functional principle of all pressure regulators that are
installed on the unit is identical:
➤
Turn clockwise to increase the pressure,
➤
turn anti-clockwise to reduce the pressure.
Содержание HERKULES PFP
Страница 2: ......
Страница 39: ...Translation of the original operation manual HERKULES PFP 39 HERKULES PFP_BAoDB_en_1402_B rs...