16
Translation of the original operation manual
HERKULES PFP
HERKULES PFP_BAoDB_en_1402_B · rs
Safety
2.7 Emergency procedures
2.7.1 Shutting down and depressurising the unit
In an emergency, the unit must be shut down and depressurised immediately.
1.
Regulate the compressed air pressure regulators for the pump and the ram
fully back.
2.
Close the compressed air shut-off valve on the air maintenance unit.
3.
Close and lock the spray gun.
4.
Hold the drain hose into a collection container and ensure that it can not slip.
5.
Open the drain valve.
2.7.2 Leakages
WARNING
In case of leakages material can escape under very high pressure and
cause serious bodily injuries and material damage.
➤
Immediately shut down the unit and depressurize it.
➤
Retighten any screw fittings and replace defective parts (only by trained
personnel).
➤
Do not try to seal leaks on the connections and high-pressure hoses with
the hand or by wrapping fabric around them.
➤
Do not repair material hoses!
➤
Check hoses and screw fittings for leaks when recommissioning the unit.
2.7.3 Injuries
In the case of injuries by processing materials or solvents, always have avail-
able the manufacturer’s safety data sheet (address, phone number, material
designation and material number of the supplier or manufacturer) for the
attending physician.
Содержание HERKULES PFP
Страница 2: ......
Страница 39: ...Translation of the original operation manual HERKULES PFP 39 HERKULES PFP_BAoDB_en_1402_B rs...